2002 American Honda Motor Co., Inc – All Rights Reserved
21 of 24
AII 24158 (0209)
23. Reinstall the power steering pump.
Reinstall the adjusting
bolt, and turn it by hand
to get the proper belt
tension of 390 to 540 N
(40 to 50 kg).
Do not overtighten!
Reinstall the P/S
hose in the bracket.
Fit the belt tension gauge
(T/N 07JGG-01010A) onto
the P/S belt.
Do not use any other
gauge!
Torque the two
mounting nuts to
24 N
.
m (17 lb-ft),
then recheck the
belt tension.
Reinstall the P/S pump
and its mounting bolts
and nuts. Do not tighten
the bolts and nuts yet.
Reinstall the P/S belt.
Make sure the belt is
properly aligned in the
grooves of the pulleys.
Reinstall the P/S fluid reservoir
back in its mounting bracket.
24. Install the A/C suction line and receiver line B.
Slide the A/C suction line and receiver line B clamp onto
the mounting stud. Make sure that the throttle and heater
cables are not caught or pinched by the bracket, then
install a 6 mm paint-cutting nut (yellow-tinted),
90361-SV4-003. Torque the nut to 10 N
.
m (7 lb-ft).
Reinstall the brake booster
hose clamp into the square
hole on the bulkhead, then
snap A/C line B into it.
Connect the A/C suction
line and receiver line B
to the evaporator with
one 6 x 30 mm flange
bolt (yellow-tinted),
95701-06030-08, and
two 6 mm paint-cutting
nuts (yellow-tinted),
90361-SV4-003. Torque
the bolt and nuts to
10 N
.
m (7 lb-ft).
Push the brake booster vacuum hose toward the
engine, then feed the suction hose on the A/C
suction line and receiver line B under it.
HEATER
VALVE
CABLE
A/C LINE B
THROTTLE
CABLE