INITIAL FIRING PROCEDURE
TO BE USED ON INITIAL FIRING:
(Searing Station, if installed, is installed by Manufacturer. DO NOT remove.)
1. Open the lid and remove the grilling surface, drip pan and
fl
ame plate.
2. Open the pellet hopper lid and check for foreign objects in the hopper.
3. Plug the grill into a three wire, grounded wall outlet.
4. Press the power button to turn the unit on.
DO NOT TOUCH THE AUGER OR THE IGNITOR!
Look to see that the auger is turning.
DO NOT TOUCH.
5. Open the hopper lid and check to see that the auger is turning freely
- approximately 2 rpm.
6. Place
your
fi
ngers over the burnpot and feel the air movement from
the combustion blower. Ignitor will glow within 1 minute.
7. Press the Power Button to turn the unit off.
8. Before replacing the removed components, Clean all items with
soap and water, then rinse and allow to dry. Re-install components.
DO NOT TOUCH
THE IGNITOR
OR THE AUGER.
PREPARING TO USE YOUR GRILL
Important: You must season the grill before cooking any food on your grill for the
fi
rst time. The unit must be operated at
maximum temperature for 1 hour with the lid closed. This allows any oil residue from the manufacturing process to burn off
and also allows the high temperature paint to cure. Avoid placing any items on the unit during this period as the paint could be
permanently damaged.
7
Содержание Smartfire PG-30
Страница 14: ...PARTS DIAGRAM 14 ...
Страница 15: ...AUGER PARTS DIAGRAM 35 38 36 37 39 34 15 ...
Страница 16: ...WIRING DIAGRAM WITH SEARING STATION 16 ...
Страница 17: ...WIRING DIAGRAM WITHOUT SEARING STATION 17 ...
Страница 19: ...19 ...