7
Step 2
:
Screw Tension Control (54) on Front Post (42) with Washer (56) and Screw (55). Then connect
Middle Wire (53) and Sensor Wire (102); and connect Tension Control (54) and Sensor Wire (60).
Screw Front Post (42) on Main Frame (59) with Screw (40), Screw (41) Washer (30) Washer (34)
and Nylon Nut (23).