Homa TCV 407 Series Скачать руководство пользователя страница 10

 

10

7.2. Automatic Float Switch Control 
Pumps supplied with a float switch start and stop automati-
cally according to the liquid level in the pit automatically. 
 
Both the distance between start level (on) and stop level (off) 
of the pump and the level of the fixing point of the float 
switch can be adjusted. 
The start level must be below the bottom of the liquid inlet 
pipe of the pit to prevent backflush into the pipe. The stop 
level must be above the water inlet of the pump to prevent 
an air cushion in the pump. 
 
To adjust the start and stop level simultaniously, the float 
switch slide must be moved along the motor housing strip. 
 
Note: Only the proper adjustment and fixing of the float 
switch cable will guarantee a reliable pump operation. After 
any modification of the float switch adjustment the function 
must be checked by a test-run of the pump. 
 

Pay attention to the maximum depth of immersion (see 

pump label). 

If the pump is installed in a sump, the sump opening 

must be covered with a tread-safe cover after installation. 

The operator has to prevent damage through the flood-

ing of rooms caused by defects of the pump through the use 
of appropriate measures (e.g. installation of alarm units, 
backup pump or like that). 
 

8. Start-Up 

Connect the pump with the mains supply. Models without 
float switch start running irrespective of the liquid level. Mod-
els with float switch operate according to the liquid level 
automatically. The pump starts running if the float switch 
reachs the adjusted start level and stops running if the float 
switch reachs the adjusted stop level. 

Never let the pump run dry for a long time of period, as it 

will destroy the pump (danger of overheating). 
 

9. Maintenance and Repair 

In case of a defect of the pump, a repair shall be carried 

out only by the manufacturer or through an authorized work-
shop. Modifications of the pump must be confirmed by the 
manufacturer. Only HOMA spare parts shall be used. 

In accordance with the product liability law we point out 

that we shall not be liable for damages caused by our prod-
uct due to unauthorized repair by persons other than the 
manufacturer or an authorized workshop or due to the use of 
spare parts other than original HOMA parts. The same prod-
uct liability limitations are valid for accessories. 

Before maintenance or repair disconnect the pump from 

the power supply to avoid accidental starting of the pump! 

Before maintenance or repair make sure that all rotating 

parts stand still! 

Before carrying out maintenance and service, the pump 

must be thoroughly flushed with clean water. Rinse the pump 
parts in clean water after dismanteling. 

At pump types with oil chamber an overpressure can 

escape with loosening of the oil chamber control screw. 
Screw only when pressure balance took place. 

Pumps running under normal operation conditions should be 
inspected at least once a year. If the pumped liquid is very 
muddy or sandy or if the pump is operating continuously, the 
pump should be inspected every 1.000 operating hours. 
 
For long and trouble-free operation of the pump, following 
points should be checked regularly: 
 
- Nominal current (A): Check with amp-meter. 

- Pump parts and impeller: Check for possible wear.  
Replace defective parts. 

- Ball bearings: Check the shaft for noisy or heavy operation 
(turn the shaft by hand). Replace defective ball bearings. A 
general overhaul of the pump is usally required in case of 
defective ball bearings or poor motor function. This work 
must be carried out by an authorized  
service workshop. 

- Cable entry: Make sure that the cable entry is watertight 
and that the cables are not bent sharply and/or pinched. 
 
Additionally at pump types with oil chamber: 
 
- Oil level and oil condition in oil chamber:  
Put the pump in horizontal position, so that the screw of the 
oil chamber is above (at larger pumps: one of both screws). 
Remove the screw and infer a small quantity of oil. The oil 
becomes greyish white like milk if it contains water. This may 
be the result of defective shaft seal.  
In this case leave the condition of the shaft seals by a HOMA 
Service to examine. 
 
The oil should be replaced after 3000 operating hours.  
Oil type: Shell Tellus C22, degradable HOMA-Atox (available 
on request). Used oil is to be disposed accordingly. 
 
Servicing Contract  
For a regular expert execution of all necessary maintenance 
and inspection we recommend the conclusion of a servicing 
contract by our HOMA Service. Please contact our HOMA 
customer service. 

Содержание TCV 407 Series

Страница 1: ...Montage und Bedienungsanleitung Installation and Operation Instruction Manual 01 2005 Baureihe Series TCV 407...

Страница 2: ...2 Inhalt Contents Seite 3 Page 8 Seite 12 Page 12 Seite 12 Page 12 DEUTSCH ENGLISH Bauma e Dimensions Ersatzteilliste und Ersatzteilzeichnungen Spare part list and spare part drawings...

Страница 3: ...r gebrachten Ausf hrung den einschl gigen grundlegenden Sicherheits und Gesundheitsanforderungen der EG Maschinenrichtlinien entspricht Bei einer nicht mit uns abgestimmten nderung der Pumpe verliert...

Страница 4: ...rung von Sammelbecken als Notpumpe bei berflutungen usw Schmirgelnde oder andere werkstoffangreifende Stoffe k nnen die Pumpe zerst ren Die Pumpen sind nicht geeignet f r den Dauereinsatz in F rderme...

Страница 5: ...n ein Entl ften der Pumpe notwendig macht Wichtig Nach jedem Ver ndern der Schwimmerbefestigung ist unbedingt die einwandfreie Funktion der Schwimmer schaltung durch einen Probelauf zu kontrollieren M...

Страница 6: ...hluss eines Wartungsvertrages durch unseren HOMA Wartungsservice Bitte wenden Sie sich an unseren Werks kundendienst 10 St rungen Ursache Abhilfe Vor jeder Wartung Pumpe vom Stromnetz trennen Netzstec...

Страница 7: ...2 47 70 20 Kundendienst unter der Hotline f r Notf lle Telefonnummer 0 22 47 70 20 0 22 47 70 23 31 Auf das im beiliegenden Garantieschein beschriebene Produkt gew hren wir eine Garantie von im Garant...

Страница 8: ...following pump types in the form in which they are marketed by us conform to the relevant fundamental safety and health requirements of the EC Machine Directives TCV 407 EC Directives to which the pu...

Страница 9: ...tay in the swimming pool during operation of the pump and that the pump is self assured by a 30 mA earth leakage circuit breaker The voltage required in the technical data sheet must correspond to the...

Страница 10: ...r or an authorized workshop or due to the use of spare parts other than original HOMA parts The same prod uct liability limitations are valid for accessories Before maintenance or repair disconnect th...

Страница 11: ...stallation place costs for the ride of the mechani cians to the location and from the installation place as well as costs for transport are not components of our warranty Complains caused by installat...

Страница 12: ...gsieb 143 Saugsieb 163 Druckdeckel 182 St tzf e 230 Laufrad 400 Gummidichtung 412 xx O Ring 433 Gleitringdichtung 550 xx Scheibe 837 Kondensator 900 xx Schraube 922 Mutter 932 Sicherungsring 14 2 Spar...

Страница 13: ...Nr Bezeichnung Menge Lieferanschrift Unterschrift Firmenstempel 15 Order Sheet for Spare Parts To HOMA Pumpenfabrik GmbH D 53819 Neunkirchen Seelscheid Fax 49 22 47 7 02 44 Pump type see pump label Ye...

Страница 14: ...14 Notizen Notes...

Страница 15: ...15...

Страница 16: ...16...

Отзывы: