Homa CH 406 Скачать руководство пользователя страница 3

CH Series            

                              

 

 

Installation, Operation & Maintenance Manual 

 

ELECTRICAL INSTALLATION: 

 

GENERAL GUIDELINES 

All electrical work shall be carried out under the 
supervision of an authorized, licensed 
electrician. 

The present state adopted edition 

of the National Electrical Code as well as all 
local codes and regulations shall be 
complied with.

 

 

VERIFICATION OF POWER SUPPLY 

Prior to making any electrical connections or 
applying power to the pump, compare the power 
supply available at the pump station to the data 
on the unit's nameplate. 

Confirm that both 

voltage and phase match between pump and 
control panel.

 The voltage supplied at the pump 

shall be plus or minus 10% of the nameplate 
value, frequency shall be plus or minus 5% of 
the nameplate value, the voltage phase balance 
shall be within 1% and the maximum corrected 
power factor shall be 1.0. 

 

POWER LEAD WIRING  

HOMA CH Series pumps may be provided with 
1 or more cables, depending on motor 
horsepower and operating voltage.  Power leads 
L1, L2, & L3 may be provided as single 
conductor, or as two conductor.  Two conductor 
configuration may use leads from two separate 
cables, or may use two conductors within one 
cable.  Please refer to wiring diagram in the 
appendix for specific connection details. 

The 

pump must be connected electrically through a 
motor starter with proper circuit breaker 
protection in order to validate warranty. Do not 
splice cables.

 

 

THERMAL SWITCH WIRING : 

Pumps are equipped with thermal switches 
embedded in the stator windings which are 
normally closed, automatically resetting 
switches.  Switches will open when the internal 
temperature rises above the design temperature, 
and will close when the temperature returns to 
normal.  Smaller CH pumps have internally 
connected thermal switches.  These units will 
not have cable leads marked T1 & T3. Larger 
CH pumps, and all Explosion Proof pumps will 
have the thermal 

 
 
 
switches configured for external control.  Pumps 
with external thermal switch connections must 
be wired by a current regulated control circuit in 
accordance with the NEC.  Identify thermal 
switch leads marked T1 and T3 in the power or 
control cable.  The resistance across these 
leads will be .5 Ohm.  These leads must be 
connected to the thermal overload relay located 
in the control panel. 

Thermal switch leads must 

be connected to validate warranty. 

 

SEAL PROBE WIRING (OPTIONAL) 

The mechanical seal leak detector probe utilized 
in the pump is a conductive probe which is 
normally open. The intrusion of water into the 
seal chamber completes the electrical circuit.  
Control panel provisions will sense this circuit 
closure, and will provide indication or alarm 
functions depending on the panel design.   
   Either single or dual wire systems may be 
provided.  Single wire systems utilize one 
energizing conductor, and the pump casing and 
neutral lead as the ground or return portion of 
the circuit.  The dual wire systems utilize two 
separate conductors for each leg of the circuit.  
With either system, the seal probe leads must be 
wired into a control circuit provided in the control 
panel.  This control circuit must energize the 
probe with a regulated power source, and sense 
the closed circuit in event of water intrusion.  
Indication and alarm functions must also be 
provided in the control circuit.  Please see 
control panel wiring diagram for seal probe 
connection points.  

IMPORTANT:  For 

Hazardous Area Classification Pumps, leak 
detector circuit must be in conformance with 
applicable NEC codes and regulations.

  

 

START / RUN CAPACITORS AND RELAYS: 

All single phase motors require start and/or run 
capacitors to operate.  Refer to the wiring 
schematics in the appendix. 

Capacitors and 

relays must be sized for the specific motor.

 

Please refer to nameplate for verification of 
capacitor sizing. 
 
 

Pg. 3

Содержание CH 406

Страница 1: ...ogy Inc 390 Birmingham Boulevard Ansonia CT 06401 CH Series Installation Operation Maintenance Manual Project _________________________ Installation ___________________ Pump Model ____________ Serial Number ____________ ...

Страница 2: ...cted For Hazardous Area Classifications only use pumps with suitable Explosion Proof Rating EQUIPMENT INVENTORY AND INSPECTION Upon arrival of pump shipment carefully unpack all components and compare with shipping and purchase order documents to ensure that the order is complete Also inspect equipment for any damage that might have occurred in shipment If any problems are detected contact an auth...

Страница 3: ...ave cable leads marked T1 T3 Larger CH pumps and all Explosion Proof pumps will have the thermal switches configured for external control Pumps with external thermal switch connections must be wired by a current regulated control circuit in accordance with the NEC Identify thermal switch leads marked T1 and T3 in the power or control cable The resistance across these leads will be 5 Ohm These lead...

Страница 4: ...r bolts into the floor of the pump station Make sure when locating and securing the anchor bolts that the base will align properly with the access cover at the top elevation of the station Refer to outline drawing in appendix Place the base in position and level the base If base is not level proper sealing of the pump to base will not occur Fully tighten all anchor and mounting bolts and verify th...

Страница 5: ...pump into position check the direction of rotation The impeller will rotate clockwise as viewed from above therefore the pump will try to move in the counter clockwise direction as the impeller rotates Bump the Motor by closing the pump circuit breaker and push the pump start button and look for the direction of movement specified above For three phase motors if the starting jerk is in the clockwi...

Страница 6: ...or 2 Power cable cut 3 Short to ground in cable or motor winding 4 Control panel circuit breaker open 5 Actual system head is higher than calculated or specified 6 Incorrect impeller rotation direction 7 Sump liquid level is below pump s minimum submergence requirement 8 Closed discharge valve or jammed check valve 9 Wear ring s worn If Applicable 10 Vortex at pump s suction 11 Discharge valve par...

Страница 7: ...d service center immediately 4 EXTERNAL PARTS ON PUMP Make sure that all screws bolts and nuts are tight Check the condition of pump lifting eyes and replace if damaged or worn Replace any external part that appears worn or damaged 5 SEAL CHAMBER OIL Check the condition of the oil to see if any water leakage has occurred Remove the oil fill plug Drain the oil from the seal chamber into a transpare...

Страница 8: ...or Cable 7 Conductor Cable Capacitor Sizing Chart Pump Capacitor Pump Capacitor Model Volts Capacitor PN Model Volts Capacitor PN CH 406 115V 80uf 370V 8856080 H 306 115V 80uf 370V 8856080 CH 406 230V 25uf 370V 8856025 H 306 230V 25uf 370V 8856025 CH 412 115V 80uf 370V 8856080 H 312 115V 80uf 370V 8856080 CH 412 230V 25uf 370V 8856020 H 312 230V 25uf 370V 8856020 CH 411 115V 60uf 370V 8856080 CH 4...

Страница 9: ...ies 3 Phase Connection Diagram Note CH Series pumps except XP pumps that have internally wired thermal switches use 4 conductor cable Ground Lug For auxiliary grounding to earth or grounding grid 4 Conductor Cable 7 Conductor Cable Seal Probe Connections Pg 10 ...

Страница 10: ...ured at pump control U V________________ Ohms V W ________________Ohms U W ________________Ohms Resistance of Ground Circuit Between Control Panel and Outside of Pump______________ Ohms MEG Ohm Check of Insulation U to Ground _______________ V to Ground _______________ W to Ground ________________ 4 Condition of Equipment at Start Up Dry __________ Wet _____________ Muddy______________ Was Equipme...

Страница 11: ...ment Difficulties During Start Up _______________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ 9 I Certify this Report to be accurate Authorized Homa Service Representative ___...

Отзывы: