Homa CH 406 Скачать руководство пользователя страница 2

CH Series            

                              

 

 

Installation, Operation & Maintenance Manual 

 

GENERAL INSTRUCTIONS: 

 

This manual is intended to provide basic 
installation and start-up guidance. It is to be read 
and thoroughly studied prior to attempting to 
install or operate any of the equipment supplied. 

Equipment damage, which occurs by not 
following these instructions will void the 
warranty. 

 

SAFETY PRECAUTIONS:

 

 

Only trained qualified personnel shall be utilized 
for installation and start-up. 

 

The following is a general list of safety 
precautions that should be followed when 
installing, starting-up or servicing the pump

. The 

pump station owner or operator is ultimately 
responsible for ensuring that all equipment 
is installed, started up and operated in a safe 
manner. 

 

  Do not work alone. 

  Double check to make sure that all lifting 

equipment is in good working order and that 
it has adequate lifting capacity for the weight 
that it will handle. 

  Wear safety helmet, goggles and protective 

shoes, or appropriate safety materials 
required. 

  Before working on the pump make sure that 

the power is disconnected and cannot be 
energized by others.  Lockout and tag the 
control panel circuit breaker. 

  Do not stand under suspended loads! 

  Never enter or work within a wet well without 

first checking to make sure sufficient oxygen 
is present and that there are no explosive or 
poisonous gases present. 

  All personnel, who work with sewage 

pumping equipment and systems shall be 
vaccinated against diseases that can occur, 
If there are any questions or doubts in this 
area it is strongly suggested that the local 
health agency be contacted. 

  For Hazardous Area Classifications, only use 

pumps with suitable Explosion Proof Rating. 

 

EQUIPMENT INVENTORY AND 
INSPECTION: 

 
Upon arrival of pump shipment carefully unpack 
all components and compare with shipping and 
purchase order documents to ensure that the 
order is complete. Also inspect equipment for 
any damage that might have occurred in 
shipment. 

If any problems are detected contact 

an authorized Homa Pump Technology 
Representative immediately. 

 

TRANSPORTATION AND STORAGE 
PROCEDURE: 

 

Always lift the pump by its lifting bail or eye. 

Never lift the pump by its power cable!

 

Pumps should be stored in an upright position, 
taking extreme care to protect the power cable 
and control cables from crushing, nicks or tears 
which would permit water intrusion.   
Power cable ends must be protected from 
immersion in water as well as moisture intrusion. 
The cable will wick water into the pump if it is not 
protected properly. Power cable leads should be 
covered with shrink tubing or suitable sealing 
material. 
 

Short Term Storage

:  Short term storage is 

defined as any time less than six months. We 
recommend that pump and accessories be 
stored in their original shipping container in a 
dry, temperature controlled area. If climate 
controlled storage is not possible, all exposed 
parts should be inspected before storage and all 
surfaces that have the paint scratched, damaged 
or worn should be re-coated with an air dry 
enamel paint. 
 

Long Term Storage

: Any storage time 

exceeding six months is considered long term. In 
addition to the safeguards specified above, the 
impeller should be rotated once a month to 
prevent the mechanical seals from being 
damaged, and the pump should be inspected. 
The oil in the mechanical seal chamber should 
be drained and replaced prior to commissioning. 
 
 

Pg. 2 

Содержание CH 406

Страница 1: ...ogy Inc 390 Birmingham Boulevard Ansonia CT 06401 CH Series Installation Operation Maintenance Manual Project _________________________ Installation ___________________ Pump Model ____________ Serial Number ____________ ...

Страница 2: ...cted For Hazardous Area Classifications only use pumps with suitable Explosion Proof Rating EQUIPMENT INVENTORY AND INSPECTION Upon arrival of pump shipment carefully unpack all components and compare with shipping and purchase order documents to ensure that the order is complete Also inspect equipment for any damage that might have occurred in shipment If any problems are detected contact an auth...

Страница 3: ...ave cable leads marked T1 T3 Larger CH pumps and all Explosion Proof pumps will have the thermal switches configured for external control Pumps with external thermal switch connections must be wired by a current regulated control circuit in accordance with the NEC Identify thermal switch leads marked T1 and T3 in the power or control cable The resistance across these leads will be 5 Ohm These lead...

Страница 4: ...r bolts into the floor of the pump station Make sure when locating and securing the anchor bolts that the base will align properly with the access cover at the top elevation of the station Refer to outline drawing in appendix Place the base in position and level the base If base is not level proper sealing of the pump to base will not occur Fully tighten all anchor and mounting bolts and verify th...

Страница 5: ...pump into position check the direction of rotation The impeller will rotate clockwise as viewed from above therefore the pump will try to move in the counter clockwise direction as the impeller rotates Bump the Motor by closing the pump circuit breaker and push the pump start button and look for the direction of movement specified above For three phase motors if the starting jerk is in the clockwi...

Страница 6: ...or 2 Power cable cut 3 Short to ground in cable or motor winding 4 Control panel circuit breaker open 5 Actual system head is higher than calculated or specified 6 Incorrect impeller rotation direction 7 Sump liquid level is below pump s minimum submergence requirement 8 Closed discharge valve or jammed check valve 9 Wear ring s worn If Applicable 10 Vortex at pump s suction 11 Discharge valve par...

Страница 7: ...d service center immediately 4 EXTERNAL PARTS ON PUMP Make sure that all screws bolts and nuts are tight Check the condition of pump lifting eyes and replace if damaged or worn Replace any external part that appears worn or damaged 5 SEAL CHAMBER OIL Check the condition of the oil to see if any water leakage has occurred Remove the oil fill plug Drain the oil from the seal chamber into a transpare...

Страница 8: ...or Cable 7 Conductor Cable Capacitor Sizing Chart Pump Capacitor Pump Capacitor Model Volts Capacitor PN Model Volts Capacitor PN CH 406 115V 80uf 370V 8856080 H 306 115V 80uf 370V 8856080 CH 406 230V 25uf 370V 8856025 H 306 230V 25uf 370V 8856025 CH 412 115V 80uf 370V 8856080 H 312 115V 80uf 370V 8856080 CH 412 230V 25uf 370V 8856020 H 312 230V 25uf 370V 8856020 CH 411 115V 60uf 370V 8856080 CH 4...

Страница 9: ...ies 3 Phase Connection Diagram Note CH Series pumps except XP pumps that have internally wired thermal switches use 4 conductor cable Ground Lug For auxiliary grounding to earth or grounding grid 4 Conductor Cable 7 Conductor Cable Seal Probe Connections Pg 10 ...

Страница 10: ...ured at pump control U V________________ Ohms V W ________________Ohms U W ________________Ohms Resistance of Ground Circuit Between Control Panel and Outside of Pump______________ Ohms MEG Ohm Check of Insulation U to Ground _______________ V to Ground _______________ W to Ground ________________ 4 Condition of Equipment at Start Up Dry __________ Wet _____________ Muddy______________ Was Equipme...

Страница 11: ...ment Difficulties During Start Up _______________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ 9 I Certify this Report to be accurate Authorized Homa Service Representative ___...

Отзывы: