
ASSEMBLY
HOLZMANN MASCHINEN GmbH www.holzmann-maschinen.at
38
WT39
18.
Pegboard - support
4 x AA
Bolts
4 x CC
Washers
4 x BB
Nuts
•
Align the holes of the pegboard support bar (21) to
the holes of the holes of the cross bracing piece (7)
as well as the upper shelf (17)
•
Insert bolts (AA x 4) through holes and fasten with
washers (CC x 4) and nuts (BB x 4)
NOTICE:
Do not over tighten!
19.
Drawer assembly – small (3x)
2 x DD
Bolts
2 x FF
Washers
2 x EE
Nuts
•
Align holes of front drawer (A1) with left and right
side of drawer (A3 and A4)
•
Insert bolts (DD x 2) per side
•
Fasten with washers (FF x 2) and nuts (EE x 2)
•
Align holes of rear drawer (A2) with left and right
side of drawer (A3 and A4)
•
Insert bolts (DD x 2) per side
•
Fasten with washers (FF x 2) and nuts (EE x 2)
•
Tighten all fasteners
NOTICE:
Do not over tighten!
•
Insert wooden drawer bottom (22) so that it rests
on lip of drawers