
ASSEMBLY
HOLZMANN MASCHINEN GmbH www.holzmann-maschinen.at
37
WT39
16.
Top shelf – right rail
2 x AA
Bolts
2 x CC
Washers
2 x BB
Nuts
•
Take the right shelf rail (19R) and fit onto the wheel
of the top right door (right side)
•
Lifting both the right shelf rail (19R) and the top
right door (18R), align the holes of (19R) with the
holes of the right side shelf bracing (14R)
•
Fasten 19R to 14R with bolts (AA x 2), washers (CC x
2) and nuts (BB x 2)
NOTICE:
Do not over tighten!
17.
Shelf backing
4 x AA
Bolts
4 x CC
Washers
4 x BB
Nuts
•
Rest the drawer backing (20) on top of the
pegboard
•
Take bolts (AA x 4) and place through pegboard
frame (10R and 10L)
•
Fasten with washers (CC x 4) and nuts (BB x 4)
NOTICE:
Do not over tighten!