HOLZMANN MASCHINEN GmbH www.holzmann-maschinen.at
Strana 33
BBS550Smart
Assembly the log support(s) (25, 25a)
on the tracks (32, 33) as shown and fix
them with screws and nuts (24).
If another extension section
BBS550SMART_RB is used, only the log
support (25) at the end has to be
replaced by the log support (25b) and
the extension rails have to be mounted
with the connection plate in the same
way as the base track.
3.
Carriage Assembly
3.1
Placing the machine head on
the mounting support
Lift the machine head out of
the transport packaging and
place it on a stable and clean
surface..
N O T E
2 persons are necessary due
to the weight of the
component. Any
Contamination (particles,..)
could scratch the surfaces.
3.2
Completing the vertical
guide
Insert the 2 vertical posts
into the sliding guides..
3.3
Assemble frame parts
Assemble both vertical frame
parts (right, left-side) onto
the vertical posts using
screw/washer/spring-
washer.
Содержание BBS550SMART
Страница 47: ...HOLZMANN MASCHINEN GmbH www holzmann maschinen at Strana 47 BBS550Smart ...
Страница 48: ...HOLZMANN MASCHINEN GmbH www holzmann maschinen at Strana 48 BBS550Smart ...
Страница 49: ...HOLZMANN MASCHINEN GmbH www holzmann maschinen at Strana 49 BBS550Smart ...
Страница 50: ...HOLZMANN MASCHINEN GmbH www holzmann maschinen at Strana 50 BBS550Smart ...
Страница 55: ......