
1. Fasten the (7) brackets for anchoring or
embedding on the tube slide (1) by means
of the required nuts and bolts as shown in
the figure.
PLEASE NOTE : It is advisable to only secure
the nuts and bolts permanently and insert the
caps once it has been checked that all the
elements have been positioned correctly.
PE tube slide body (final)
PE nut cover
M8 washer
M8x200 HEX SCREW
PE cap
self-locking nut M8 final tube
bracket
Name
Quantity
Article no.
1
8
8
4
8
4
2
1
2
3
4
5
3
7
Содержание XT 400
Страница 1: ...XT 400 Fort Romy Structure assembly instructions XT 400 Fort Romy Structure assembly instructions...
Страница 3: ...safety and loose shockproof area 98 33 sqm shockproof rubber 115 1 sqm...
Страница 11: ...TOWER C struts 29 31 TOWER D struts 15 13...
Страница 14: ...ASSEMBLY INSTRUCTIONS assembly details...
Страница 32: ...safety area 98 33 sqm shockproof 115 1 sqm...
Страница 33: ...digging plans depth60cm...
Страница 38: ...1 Dig a hole with a diameter of 30 m that is 60 cm deep 2 Cast a first layer of concrete that is 10 cm thick...
Страница 44: ...Measurement varies based on the height of the slide entrance from a minimum of 20 to a maximum of 35 cm...