
M8x80 wide hex screw
1.
Position the holes on the bridge joist (1) in line with the
holes on the platform frame pre-drilled table, inserting the
nuts and bolts for fixing as shown in the figure.
2.
Repeat the operation on the other side of the bridge.
NAME
CODE NO.
Quantity
Article no.
fixing cross-piece
PE nut cover __________________
PE cap ___________________________
08ISQ7089 washer __________________
M8x155 HEX SCREW
UNI7473 M8 self-locking nut
PE shaped nut cover
Содержание XT 400
Страница 1: ...XT 400 Fort Romy Structure assembly instructions XT 400 Fort Romy Structure assembly instructions...
Страница 3: ...safety and loose shockproof area 98 33 sqm shockproof rubber 115 1 sqm...
Страница 11: ...TOWER C struts 29 31 TOWER D struts 15 13...
Страница 14: ...ASSEMBLY INSTRUCTIONS assembly details...
Страница 32: ...safety area 98 33 sqm shockproof 115 1 sqm...
Страница 33: ...digging plans depth60cm...
Страница 38: ...1 Dig a hole with a diameter of 30 m that is 60 cm deep 2 Cast a first layer of concrete that is 10 cm thick...
Страница 44: ...Measurement varies based on the height of the slide entrance from a minimum of 20 to a maximum of 35 cm...