
fasten the handrail (7) to the struts (8)
at a height of 77 cm from the platform to
the top part of the handrail, inserting the
nuts and bolts required for fastening as
shown in the figure.
If widenings are present on the handrail
follow instructions B.
PLEASE NOTE: It is advisable to only secure
the nuts and bolts permanently and insert
the caps once it has been checked that all
the elements have been positioned
correctly.
IF WIDENINGS
ARE PRESENT ON THE
HANDRAIL
M8xl00 TORX screw
M8xl20 TORX screw M8
washer finned PE cap
025 PE cap PE nut cover
handrail climbing board
strut
1
2
3
4
5
6
7
8
4
4
4
4
4
4
2
4
Name
Article no.
Quantity
Содержание XT 400
Страница 1: ...XT 400 Fort Romy Structure assembly instructions XT 400 Fort Romy Structure assembly instructions...
Страница 3: ...safety and loose shockproof area 98 33 sqm shockproof rubber 115 1 sqm...
Страница 11: ...TOWER C struts 29 31 TOWER D struts 15 13...
Страница 14: ...ASSEMBLY INSTRUCTIONS assembly details...
Страница 32: ...safety area 98 33 sqm shockproof 115 1 sqm...
Страница 33: ...digging plans depth60cm...
Страница 38: ...1 Dig a hole with a diameter of 30 m that is 60 cm deep 2 Cast a first layer of concrete that is 10 cm thick...
Страница 44: ...Measurement varies based on the height of the slide entrance from a minimum of 20 to a maximum of 35 cm...