Holman MM14 Скачать руководство пользователя страница 13

 

PAGE 12 

 

OPERATOR'S MANUAL 

HOLMAN CONVEYOR BAKERS 

MODEL MM14 

 
WIRE DIAGRAM 
 

 

 

 
 
                

 

 

REVISED 7/9/01 MJC 

Содержание MM14

Страница 1: ...ING INSTRUCTIONS PAGE 3 OPERATION PAGE 4 CLEANING PROCEDURES PAGE 4 5 TROUBLESHOOTING GUIDE PAGE 5 6 7 MAINTENANCE PROCEDURES PAGE 8 9 10 PARTS LIST EXPLODED VIEW PAGE 11 DRAWINGS LOAD AND UNLOAD TRAY...

Страница 2: ...ND INSTALLATION A Attach legs by screwing into weld nuts as shown ADJUSTABLE LEGS SCREWS INTO WELD NUT ON BOTTOM OF UNIT B Anti Skid pads are available at no charge and may be adhered to the foot sect...

Страница 3: ...to the ON position Turn conveyor belt speed control to the maximum setting and check all heater tubes and conveyor for proper operation F Allow approximately 5 to 8 minutes for the fan cooling system...

Страница 4: ...stacking spacer as shown below External air duct must be installed for cooling system of top unit to function properly 4 Screw cap screws 4ea into leg holes on top oven 5 Place top oven on stacking sp...

Страница 5: ...ESE UNITS DISCONNECT UNIT FROM POWER SUPPLY BEFORE SERVICING OR CLEANING UNIT A Remove Load and Unload Trays daily as shown and wash with hot soapy water CRUMB TRAY CRUMB TRAY LOAD UP TRAY UNLOAD TRAY...

Страница 6: ...s switched to the ON position and there is power at the outlet 2 Check to see that the unit is connected to power and Master On Off is switched to the ON position 3 Be sure HEAT LIMIT SWITCH is pushed...

Страница 7: ...the switch which is located as shown HEAT LIMIT SWITCH THE HEAT LIMIT SWITCH CAN BE ACTIVATED IF THERE IS NOT A PROPER AMOUNT OF AIR FLOW BEING GENERATED BY THE COOLING FAN IF THIS OCCURS 1 DISCONNECT...

Страница 8: ...l binding If Conveyor moves freely call Holman Service Department 1 800 225 3958 as Drive Motor and or Variable Speed Control may have to be replaced refer to page 9 for instructions on replacing driv...

Страница 9: ...ater Tube out of unit 6 GENTLY place new Heater Tube into unit 7 Replace heater tube retainers 8 Reconnect heater wires to terminal block connections 9 Replace side panels and test unit for proper ope...

Страница 10: ...h white tape The new Drive Motor should use the same arrangement 5 Remove the four screws that hold the Drive Motor in place 6 Put the new motor in place and loosely attach with the four screws remove...

Страница 11: ...g the Variable Speed Control in the side panel be sure to reposition the anti rotation pin in the anti rotation slot on the panel 6 Replace lock nut and control knob FAN SWITCH WASHER NUT NUT KNOB SWI...

Страница 12: ...Drive Shaft 21a 1 200708 Cap Control Knob 7 1 101252 Idler Shaft 22 1 402230 Control Side Panel L R 8 4 112262 Bearing 22 1 402231 Control Side Panel R L 9 1 200509 Drive Motor right to left 23 1 4021...

Страница 13: ...PAGE 12 OPERATOR S MANUAL HOLMAN CONVEYOR BAKERS MODEL MM14 WIRE DIAGRAM REVISED 7 9 01 MJC...

Страница 14: ...1 800 807 9054 MODEL S N DATE CODE VOLTS PART NO STYLE POSITION QTY MM14 0199 TO 0899 208 GE 198002 QUARTZ TOP 6 MM14 0199 TO 0899 208 2N 209195 METAL BOTTOM 6 MM14 0199 TO 0899 240 GE 198005 QUARTZ T...

Отзывы: