Operating instructions
149 443
187
C 4.74
Maintenance every 3000 hours
Check the injection nozzles
ATTENTION
This work may only be carried out by an au-
thorized workshop.
- Clean the injection nozzles.
- Check the injection nozzles with a test pressure of
250 +8 bar.
Change the toothed belt
Change every 3000 hours or 5 years maximum.
See maintenance instructions of the engine manufacturer.
ATTENTION
This work may only be carried out by an au-
thorized workshop.
- Remove the left-hand cover of the toothed belt drive.
- Check the toothed belt for cracks over its entire length.
- Replace damaged toothed belts.
NOTE
When replacing the toothed belt, also replace
the idler pulley.
Содержание C-Trac 4.74
Страница 1: ...Date of Issue 15 07 2008 Order No 149 443 OperatingInstructions C Trac 4 74 ...
Страница 2: ......
Страница 6: ......
Страница 76: ......
Страница 112: ......
Страница 126: ......
Страница 136: ......
Страница 138: ......
Страница 150: ......
Страница 162: ......
Страница 164: ......
Страница 176: ......
Страница 180: ......
Страница 188: ......
Страница 190: ......
Страница 192: ......
Страница 198: ......