Operating instructions
149 443
161
C 4.74
Maintenance during the first period
of operation
The following checks and services are due during the first
period of operation:
Maintenance after the first 50 hours
Maintenance after the first 500 hours
Maintenance after the first 50 hours
Check the engine for leaks
- Raise the dump body (loading platform*) and secure it
against accidental lowering.
-
Check the engine and implements for leaks.
Carry out the other services in accordance with the mainte-
nance schedule. You can find the description of the serv-
ices using the indications in the maintenance schedule or
in the alphabetical index.
* Option
Содержание C-Trac 4.74
Страница 1: ...Date of Issue 15 07 2008 Order No 149 443 OperatingInstructions C Trac 4 74 ...
Страница 2: ......
Страница 6: ......
Страница 76: ......
Страница 112: ......
Страница 126: ......
Страница 136: ......
Страница 138: ......
Страница 150: ......
Страница 162: ......
Страница 164: ......
Страница 176: ......
Страница 180: ......
Страница 188: ......
Страница 190: ......
Страница 192: ......
Страница 198: ......