Servicing
Hohner Maschinenbau GmbH
HK 43/6 S
49
4.2.4 Replacing the knife
- Fig. 31 -
- To replace the knife, move the knife box
a
completely away from the guide
c
by turning the
knurling wheel
b
and remove from the stitching head.
- Fig. 32 -
- Push the knife slider
e
out of the knife box
a
(arrow A)
Make sure that the pressure spring doesn’t strip.
- Change the knife (see following chapter)
- Fig. 34 -
- Replace knife slider
e
in the knife box
a
(arrow B), compressing the pressure spring of the knife
slider with a screwdriver, and pushing it into the knife box. Make sure that the pressure spring is
not bent.
- Fig. 31 -
- Place knife box
a
on the guide
c
.
- Attach flexible wire feed to drill hole
d
in knife box.
- Return knife box to the desired position by turning the knurling wheel.
4.2.4.1 Rotating/Changing the flat knife
- Fig. 33 -
The flat knife has 2 cutting edges. If the first cutting edge is blunt, the knife can be rotated.
- Unscrew fastening screw
i
.
- Rotate or replace flat knife
h
and tighten fastening screw
i
.
4.2.4.2 Replacing the circular knife
- Fig. 33 -
- Loosen the clamping screw
f
and remove the circular knife
g
.
- Press new circular knife completely into the seat in the knife box.
- Adjust circular knife (cf. Adjusting the circular knife).
4.2.4.3 Adjusting the circular knife
- Fig. 35 -
The circular knife is adjusted so as to ensure clean cutting of the wire.
When the knives are mounted, set the clearance between the flat and circular knives by carefully
“levering” with a screwdriver.
- Loosen clamping screw
f
and position circular knife
g
exactly against the flat knife by "levering"
with a screwdriver.
- Tighten clamping screw
f
.
If the distance between the knives is set too close the knife slider 5 may block and cause a wire
jam.
Содержание UNIVERSAL 43/6 S
Страница 2: ...HK 43 6 S Hohner Maschinenbau GmbH 2...
Страница 9: ...Safety Information Hohner Maschinenbau GmbH HK 43 6 S 9...
Страница 14: ...Description of the Stitching Head HK 43 6 S Hohner Maschinenbau GmbH 14 Fig 2 Stroke...
Страница 16: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 16 3 Operation Fig 4 Fig 5 a e d c b f b Middle of staple...
Страница 18: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 18 Fig 6 a b d c...
Страница 20: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 20 Fig 7 b a...
Страница 22: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 22 Fig 8a Fig 8b Fig 8c b a d c...
Страница 24: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 24 Fig 9 Fig 10 a b c e g f i j d h...
Страница 26: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 26 Fig 11 c a b...
Страница 28: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 28 Fig 12 a b...
Страница 30: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 30 Fig 13 e b a c d...
Страница 32: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 32 Fig 14 Fig 15 Fig 16 b e d c A A B a A A B b View X...
Страница 40: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 40 4 Servicing Fig 22...
Страница 42: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 42 4 2 Installation and replacement of parts Fig 23 Fig 24 a b...
Страница 44: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 44 Fig 25 a c b...
Страница 46: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 46 Fig 28 Fig 29 Fig 30 a b c b A B e d C D e Fig 26 Fig 27...
Страница 50: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 50 Fig 36 Fig 37 Fig 38 b c a a b d e c f g h...
Страница 52: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 52 Fig 39 a b c d...