Description of the Stitching Head
Hohner Maschinenbau GmbH
HK 43/6 S
11
2.1 General overview
- Fig. 1 -
2.2 Conformity
The Stitching Head 43/6 S conforms to the following guidelines and standards:
- Machine Guideline (98/37/EEC)
- EN 1010-1:1998 (final draft version) and
EN 1010-4:1997 ”Machine safety – safety requirements in connection with the design and
manufacture of printing and paper processing machines”, ”Part 1: General requirements” and
”Part 4: Bookbinding, paper processing and paper finishing machines”.
- This Operating Manual takes account of DIN EN 292, machine safety, basic terminology, general
principles of design.
2.3 Marking and type plate
The type plate is located at the front of the stitching head.
2.4 Technical data
Net weight of the stitching head
1,5 kg / 3.31 lbs
Quality of the stitching wire
Only use perfect quality classes, in normal or
steel strength as required. Pay attention to
abrasion resistance, as heavy abrasion will clog
the wire-guidance parts.
Содержание UNIVERSAL 43/6 S
Страница 2: ...HK 43 6 S Hohner Maschinenbau GmbH 2...
Страница 9: ...Safety Information Hohner Maschinenbau GmbH HK 43 6 S 9...
Страница 14: ...Description of the Stitching Head HK 43 6 S Hohner Maschinenbau GmbH 14 Fig 2 Stroke...
Страница 16: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 16 3 Operation Fig 4 Fig 5 a e d c b f b Middle of staple...
Страница 18: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 18 Fig 6 a b d c...
Страница 20: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 20 Fig 7 b a...
Страница 22: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 22 Fig 8a Fig 8b Fig 8c b a d c...
Страница 24: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 24 Fig 9 Fig 10 a b c e g f i j d h...
Страница 26: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 26 Fig 11 c a b...
Страница 28: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 28 Fig 12 a b...
Страница 30: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 30 Fig 13 e b a c d...
Страница 32: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 32 Fig 14 Fig 15 Fig 16 b e d c A A B a A A B b View X...
Страница 40: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 40 4 Servicing Fig 22...
Страница 42: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 42 4 2 Installation and replacement of parts Fig 23 Fig 24 a b...
Страница 44: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 44 Fig 25 a c b...
Страница 46: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 46 Fig 28 Fig 29 Fig 30 a b c b A B e d C D e Fig 26 Fig 27...
Страница 50: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 50 Fig 36 Fig 37 Fig 38 b c a a b d e c f g h...
Страница 52: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 52 Fig 39 a b c d...