![Hohner UNIVERSAL 43/6 S Скачать руководство пользователя страница 17](http://html.mh-extra.com/html/hohner/universal-43-6-s/universal-43-6-s_operating-instructions-manual_2144676017.webp)
Operation
Hohner Maschinenbau GmbH
HK 43/6 S
17
3.1 Installation of the stitching head
3.1.1 Clamping the stitching head
- Fig. 4 -
The stitching head is held by a tenon block which is inserted into the stitching head mounting on
the machine.
- Unscrew tenon block from the stitching head with Allen key SW4
e
.
- Introduce tenon block laterally into the stitching head mounting
b
.
- Insert stitching head into stitching head mounting, so that the driver lug
c
can be inserted into
the stroke bar
d
and the tenon block fits into the stitching head.
- Fix the stitching head by tightening the tenon block in the stitching head mounting using the Allen
key
e
.
3.1.1.1 Lateral adjustment of the stitching head
- Fig. 4, Fig. 5 -
The center of the wire formed parts within the stitching head must be set to the desired stitching
position for the wire stitch by lateral adjustment.
- Loosen the tenon block
a
with the Allen key
e
.
- Move the stitching head sideways, until the desired position is reached.
- Fix the tenon block in the stitching head mounting
b
with the Allen key.
3.1.1.2 Front adjustment of the stitching head
- Fig. 5 -
The lifting movement of the wire formed parts must drive the stitch accurately into the clincher box
forming gap. (Cf. Chap. 3.1.4). If the center of the wire stitch is located too far in front of or behind
the clincher box, or if the lifting movement is not precisely aligned with the clincher box, this can be
corrected by adjusting the set screws
f
on the stitching head.
- Remove stitching head.
- Adjust set screws
f
.
- Fit stitching head.
Содержание UNIVERSAL 43/6 S
Страница 2: ...HK 43 6 S Hohner Maschinenbau GmbH 2...
Страница 9: ...Safety Information Hohner Maschinenbau GmbH HK 43 6 S 9...
Страница 14: ...Description of the Stitching Head HK 43 6 S Hohner Maschinenbau GmbH 14 Fig 2 Stroke...
Страница 16: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 16 3 Operation Fig 4 Fig 5 a e d c b f b Middle of staple...
Страница 18: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 18 Fig 6 a b d c...
Страница 20: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 20 Fig 7 b a...
Страница 22: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 22 Fig 8a Fig 8b Fig 8c b a d c...
Страница 24: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 24 Fig 9 Fig 10 a b c e g f i j d h...
Страница 26: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 26 Fig 11 c a b...
Страница 28: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 28 Fig 12 a b...
Страница 30: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 30 Fig 13 e b a c d...
Страница 32: ...Operation HK 43 6 S Hohner Maschinenbau GmbH 32 Fig 14 Fig 15 Fig 16 b e d c A A B a A A B b View X...
Страница 40: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 40 4 Servicing Fig 22...
Страница 42: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 42 4 2 Installation and replacement of parts Fig 23 Fig 24 a b...
Страница 44: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 44 Fig 25 a c b...
Страница 46: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 46 Fig 28 Fig 29 Fig 30 a b c b A B e d C D e Fig 26 Fig 27...
Страница 50: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 50 Fig 36 Fig 37 Fig 38 b c a a b d e c f g h...
Страница 52: ...Servicing HK 43 6 S Hohner Maschinenbau GmbH 52 Fig 39 a b c d...