Safety Information
M 45/6
Hohner Maschinenbau GmbH
8
1.10 Parts of the equipment which are particularly dangerous
There is a
risk of injury
in the area of moving parts of the stitching head.
1.11 Maintenance and repair work, elimination of faults
Undertake the required setting, servicing and inspection work on schedule.
The machine may only be operated in cycle mode during all servicing, inspection and repair work
on the
Stitching Head M 45/6
.
Always make absolutely sure
that the machine is only being operated by one person in order
to avoid any influence to the machine by any other persons.
1.12 Structural modifications to the stitching head
Changes to the stitching head, additions or modifications may only be undertaken with the
manufacturer's permission.
1.13 Cleaning the machine and the disposal of waste products
The functionality of the stitching head and perfect processing of the product can only be
guaranteed over a prolonged period of time if the stitching head is regularly cleaned and
maintained in accordance with the standard methods of mechanical engineering.
In this regard, particular attention should be paid to the regular removal of trimmed paper
residue and paper dust, as these can result in jamming of the stitching head or increased
wear.
Substances and materials used (e.g. solvents and lubricants) must be handled correctly and
disposed of in an environmentally friendly manner.
Содержание M 45/6
Страница 2: ...M 45 6 Hohner Maschinenbau GmbH 2...
Страница 12: ...Description of the Stitching Head M 45 6 Hohner Maschinenbau GmbH 12 Fig 2...
Страница 14: ...Operation M 45 6 Hohner Maschinenbau GmbH 14 3 Operation Fig 4...
Страница 16: ...Operation M 45 6 Hohner Maschinenbau GmbH 16 Fig 5...
Страница 18: ...Operation M 45 6 Hohner Maschinenbau GmbH 18 Fig 6...
Страница 20: ...Operation M 45 6 Hohner Maschinenbau GmbH 20 Fig 7 Fig 8...
Страница 22: ...Operation M 45 6 Hohner Maschinenbau GmbH 22 Fig 9...
Страница 24: ...Operation M 45 6 Hohner Maschinenbau GmbH 24 Fig 10...
Страница 26: ...Operation M 45 6 Hohner Maschinenbau GmbH 26 Fig 11...
Страница 28: ...Operation M 45 6 Hohner Maschinenbau GmbH 28 Fig 12...
Страница 30: ...Operation M 45 6 Hohner Maschinenbau GmbH 30 Fig 13 Fig 14 A B A...
Страница 32: ...Operation M 45 6 Hohner Maschinenbau GmbH 32 correct incorrect incorrect Fig 15 Fig 16 Fig 17...
Страница 34: ...Servicing M 45 6 Hohner Maschinenbau GmbH 34 4 Servicing Fig 18...
Страница 36: ...Servicing M 45 6 Hohner Maschinenbau GmbH 36 4 2 Installation and replacement of parts Fig 19 Fig 20...
Страница 38: ...Servicing M 45 6 Hohner Maschinenbau GmbH 38 Fig 21 Fig 22 A...
Страница 40: ...Servicing M 45 6 Hohner Maschinenbau GmbH 40 A B Fig 24 Fig 23 Fig 25 Fig 26 Fig 27...
Страница 42: ...Servicing M 45 6 Hohner Maschinenbau GmbH 42 Fig 28...