52
52
Section 2 - Stripe Hog Systems
2.11 Electrical System
Your truck can be equipped with either a 12 volt
or 24 volt DC electrical system depending on your
location and the options selected. The water
blasting electrical system is totally isolated from
the truck electrical system.
The water blasting system is equipped with two
heavy duty main circuit breakers on the front side
of the skid. The main circuit breakers protect the
water blasting DC circuits and can function as the
main disconnect switch to deactivate the water
blasting electrical system. Fuses in the outside
terminal box (OTB) protect accessory circuits acti-
vated by switches in the panel and other electrical
equipment installed by Hog Technologies.
Main Circuit Breakers
The 50 and 30 amp main breakers are connected
directly to the skid batteries and supply electri-
cal power to the OTB accessory fuse panels. The
breakers must be on to power the water blasting
electrical system.
Each main circuit breaker is equipped with a yellow
indicator/reset lever that shows the status of the
breaker (ON or OFF/TRIPPED). It is also used to
reset the breaker if it trips or to turn the breaker
and electrical system off.
These are heavy duty circuit breakers that typi-
cally trip only when there is a fault in the system.
If a main breaker trips, you should find and cor
-
rect the problem before resetting the breaker.
The breaker is reset by moving the yellow lever
to the ON position.
Each main breaker can be used as a main discon-
nect switch by manually moving the yellow lever to
the OFF or ON position. Move the lever to the ON
position to activate the electrical system. Move
the yellow lever to the OFF position to deactivate
the electrical system.
Typical Main Circuit Breakers
Main Circuit Breaker Reset Lever
Содержание SK5500
Страница 2: ......
Страница 80: ...80 NOTES...
Страница 135: ...135 Section 5 Scheduled Maintenance Hog Technologies...
Страница 141: ...141 Appendix 2 Tools Spare Parts...
Страница 142: ...142 Appendix 2 Tools Spare Parts...
Страница 143: ...143 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM...
Страница 151: ...151 Appendix 4 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 68 Nozzle Calculation Sheet...
Страница 152: ...152 NOTES...
Страница 159: ......
Страница 160: ......