background image

(0,25 mbarg) since it doubles as both the Pressure and the 
Purge Flow Sensor Set points of 1”wc (2.5 mbarg) are 
common. Please check the documentation for the actual 
setting.  

 

2.8  Open the FCV again and set the PE pressure to a level 
somewhere between the Minimum Pressure Sensor set 
point and the RLV opening pressure. The “working” pressure 
is not critical.  Enough pressure to keep the “Pressurized” 
indicator Green is sufficient. 

 

2.9  On Y/Z Hoffman Purge/Pressurized Units the purge 
timing and power control is preformed manually by the User. 
Never turn on the power without purge first, unless you 
have proved that the interior of the PE is gas free and 
check that the “Pressurized” indicator is green! 

 

2.10  After initial commissioning, the unit is ready for normal 
operation. 

 

2.11 Y/Z Hoffman Purge/Pressurization Units are started and 
stopped by the shutoff valve but the User must close the 
Power Switch only after the enclosure has been pressurized 

and the purge sufficient to ensure that the interior of the 
enclosure is gas free.  The power should be shut off as soon 
as possible after a pressure failure.    This is also the User’s 
responsibility. 
 
 
2.12 “Y/Z” purge units do not control the enclosure power. It 
is the responsibility of the user to switch off the power 
whenever the enclosure pressure falls below the minimum 
permitted i.e. when the “Pressurized” indicator turns Red.  
 
2.14 Normal Operation  
 
2.14.1
 Turn the air supply valve On or Off to start or stop the 
unit,  
 
2.14.2 The user must close the Power Switch only after the 
enclosure has been pressurized and purged sufficiently to 
ensure that the interior of the enclosure is gas free. It is the 
user’s responsibility to shut off the power, as soon as 
possible after a pressure failure.  
 

 

Section 3 Maintenance of the Unit

 

 

The maintenance recommended for the unit consists of the 
following, supplemented by any additional local requirements 
imposed by the authority having jurisdiction.  
 
3.1 Initial Maintenance  
Hoffman recommends that the commissioning test be 
repeated at least every six months. They include checking 
the opening pressure of the Relief Valve, setting of the 
Minimum Pressure Sensor, and the "Normal Working 
Pressure" of the enclosure. In addition, the following checks 
are also recommended at that time:  
 
- Check the RLV and any other Spark Arrestors. Remove 
any debris or corrosion, or replace the Spark Arrestor with a 
spare.  

 
- Check the condition of the air supply filter element. Clean 
or replace it as necessary.  
 
3.2 Routine Maintenance  
At least every two years, the following additional checks are 
recommended:  
- Apparatus is suitable for the Hazardous Location  
- There are no unauthorized modifications  
- The source of air is uncontaminated  
- The interlocks and alarms function correctly  
- Approval labels are legible and undamaged  
- Adequate spares are carried  
- The action on pressure failure is correct  
 

 

Section 4 Fault Finding – CF Unit 

 

4.1 General  
 
If the unit does not behave in the manner described above 
there is a fault. Some of the more likely faults are dealt with 
below. If a cure cannot be affected by following the 
procedure shown below please call Hoffman or your supplier 
for further assistance. The unit has been designed for ease 
of fault finding and many of the components fitted are plug-in 
or sub-base mounted. Check components by substitution 
only after establishing that such action is necessary. If the 
unit is less than 12 months old, parts under warranty should 
be returned to Hoffman for investigation, with a full report of 
the fault and the unit Serial number. NOTE: As with any 
pneumatic unit the greatest enemies are water, oil and 
debris in the air supply. For this reason a dust and water 
filter should always be fitted. But debris can enter from other 
sources and it is vital therefore that the procedure described 
in Section 2 is carried out before using the unit for the first 
time, or following any disconnection of the pipework. Failure 
to perform this work may cause damage, which will not be 
covered under warranty.  
 

Fault Finding NOTE: Before making the following checks, 
verify that the main supply pressure is between 60 and 115 
psi (4-8 bar) at the Control Unit. 
 
4.2 Minimum Pressure Alarm is ON Continuously 
(“Pressurized” Indicator is Red)  
 
Possible cause 1:
 The Pressurized Enclosure (PE) 
pressure is too low. Try increasing the setting of the Flow 
Control Valve (FCV) to raise the pressure in the PE. This is 
accomplished by turning the FCV in a counterclockwise 
direction.  
 
Possible cause 2: Enclosure fault?  
 
- Is the ACTUAL PE pressure below the setting of the 
Minimum Pressure Sensor? Check it with a manometer or 
gauge.  
- is the Outlet Orifice fitted correctly? 
 
- Is there debris stuck on the face of the Relief Valve (RLV) 
disk, perhaps held there because of the magnetic material? 
 

Содержание PCFB1YZ

Страница 1: ...ication Sheet CF Y Z Purge Pressurization Unit 2 Application Suitability 3 Installation Operation and Maintenance for CF Units Section 0 Description and Principle of Operation Section 1 Installation o...

Страница 2: ...anada NFPA 496 UL E466718 Class I Div 1 Class I Div 2 Groups A B C D Groups A B C D For limitations and conditions of use refer to the applicable certificate at the back of this manual Supply Pressure...

Страница 3: ...t be fitted to the Pressurized Enclosure The following materials are used in the construction of Hoffman Purge Pressurization Units If substances that will adversely affect any of these materials are...

Страница 4: ...alibrated Outlet Orifices Where the Outlet Orifice disk is removable and can be easily changed by the user to give different flow rates according to the size of the PE and the available air supply cap...

Страница 5: ...the PE Exception Power to Intrinsically Safe or other apparatus which is already suitable for the location need not be isolated by the Hoffman Purge Pressurization unit When utilizing Y Z Pressurizat...

Страница 6: ...the RLV and any other Spark Arrestors Remove any debris or corrosion or replace the Spark Arrestor with a spare Check the condition of the air supply filter element Clean or replace it as necessary 3...

Страница 7: ...le cause 2 Excessive Pressurized Enclosure PE leakage Check around the PE when flow is taking place Any significant leakage must be cured Has a Leakage Test been done The total leakage should not exce...

Страница 8: ...Arrestor with circle clip Fix Spark Arrestor to Enclosure ensuring that Control Unit and Spark Arrestor are diagonally opposed 5 Connect output dry contact alarm as required 6 Connect isolated air su...

Страница 9: ...Quick Installation Guide PCFF1YZ...

Страница 10: ...clip Fix Spark Arrestor to Enclosure ensuring that Control Unit and Spark Arrestor are diagonally opposed 5 Connect output dry contact alarm as required 6 Connect isolated air supply to Control Unit 7...

Страница 11: ...Spark Arrestor Orifice Relief Valve Drawing...

Страница 12: ...Relief Valve Position Relief Valve Cutout Schematic for both PCFB1YZ and PCFF1YZ...

Страница 13: ...instructions and Article 504 of the NEC ANSI NFPA 70 3 For guidance on Installation see ANSI ISA RP12 6 Installation of IS Instrument Systems in Class I Hazardous Locations 4 Voc or Vt of associated a...

Страница 14: ......

Страница 15: ......

Страница 16: ...Hoffman Enclosures Inc 2100 Hoffman Way Anoka Minnesota 55303 1745 USA Phone 763 422 2211 www hoffmanonline com P N 89108870 Dwg 89109562 A...

Страница 17: ......

Отзывы: