•
12
Remove the main and jib halyard lines from the
ropes bags. Unroll the main halyard wire that is se-
cured at the head of the mast. Using a bowline knot,
secure the main halyard line to the thimble at the end
of the halyard wire. Now, secure both ends at the
base of the mast.
Mast and rigging
PREPARATION OF THE MAST
1
Remove all the wires from the wires bag and unroll them.
Ensure that all twists are removed.
Locate the 8 mm tang shackle and shackle the five wires to
the mast tang, as per photograph. Ensure that the shackle
is tightened securely.
If you have a spinnaker (option), also at this stage thread
the spi halyard through the pulley near the top of the mast.
See the spi rigging diagram page 23
2
1.
Trapeze
2.
Shrouds
3.
Pigtail, forestay & jib halyard
1
1
2
2
3
3
Содержание Twixxy
Страница 24: ...24 TRUMPET SPINNAKER Option...