background image

18

A part

Middle frame cap

Small truss screw

5×10×10

Roof rafter set

Roof retainer (middle)

Beam

depth set

Gutter

Middle frame

Roof retainer (end)

Beam

depth set

Sealing

Sealing

Sealing

Sealing

Rain water cover

Sealing

Sealing

Middle frame

Side frame

Middle frame

Side frame

Roof retainer

 (end)

Roof retainer

 (middle)

Small truss screw

5×10×10

Small truss screw

5×10×10

Roof rafter set

Detailed section drawing

Peel off the back sheet of 
the rain water cover and 
attach to the end upper face 
of the middle frame and do 
sealing work around it.

Do sealing work to the 
insert part of cap into 
middle frame and side 
frames.

When screwing the roof retainer (end), insert the 

end part of roof retainer into the gutter cap before 
screwing the second screw from the post side.

A part 

detailed figure

Do sealing work to the insert part of roof retainer (end) into middle frame.

Step2

Step3

Step3

12

Installation of roof retainer

Insert the end of roof retainer into the 
middle frame, and fix from the middle 
frame side with small truss screw 5x10x10.

Step1

If the screw of installing the roof retainer is tighten 
too much, the screw will run idle. Tightening torque 
is about less than 1.5Nm (15kgfcm).
If the screw head leans when installing the roof 
retainer, it will cause water leakage (water will enter 
from the screw head clearance), so install it not to 
make clearance.

Notice

For D36 to D60(Wide beam)

For D72/D80 triple type

7

PJWY-W43B-2
PJWY-W43B-3
PJWY-W43E-4
PJWY-W50A-4
PJWY-W50C-2
PJWY-W50C-3
PJWY-W50E-4
PJWY-W57A-4
PJWY-W57E-2
PJWY-W57E-3
PJWY-W57E-4
PJRY-W43

-

PJRY-W50

-

PJRY-W57

-

1

2
3

4

2
3

4

2
3
4
5
6
7

Shape

Description

Content

Parts ID

Quantity

Post set

(standard)

PJRH-18A

PJRH-18B

PJRH-18C

Post set

(1pc)

(standard)

PJRH-18A-1

PJRH-18B-1

PJRH-18C-1

Post set

(long post)

PJRH-23A

PJRH-23B

PJRH-23C

2

1

1

1

1

2

1

1

1

1

1

1

1

Post

Post

Post

Round gutter

GA4923

Instruction manual

Post

Round gutter

GA4923

Round gutter

GA4923

Instruction manual

Post set

(1pc)

(long post)

PJRH-23A-1

PJRH-23B-1

PJRH-23C-1

Post set

(extra-long post)

PJRH-28F-1

PJRH-28G-1

Post

Round gutter

GA4923

Round gutter

GA4923

Instruction manual

Shape

Description

Content

Parts ID

Quantity

2

1

PJWY-W43B-2
PJWY-W43B-3
PJWY-W43E-4
PJWY-W50A-4
PJWY-W50C-2
PJWY-W50C-3
PJWY-W50E-4
PJWY-W57A-4
PJWY-W57E-2
PJWY-W57E-3
PJWY-W57E-4

12
18
24
28
14
21
28
32
16
24
32

Length set

PJWY-W43B-2

PJWY-W43B-3

PJWY-W43E-4

PJWY-W50A-4

PJWY-W50C-2

PJWY-W50C-3

PJWY-W50E-4

PJWY-W57A-4

PJWY-W57E-2

PJWY-W57E-3

PJWY-W57E-4

Gutter

Main frame

Panel holder

 (middle)

L=645

Panel holder

 (end)

L=300

Round gutter

GA4923

Roof panel cushion

GB8274

Parts contents

Please open the captioned carton and check all contents in advance.

Please check the parts defective or any damage.

After opening the carton boxes, please store the products so that 
they are not damaged.

We packed some extra screw in the parts box.

x

number is 

necessary Q'ty for installation.

When 

mark is P, it’s the polycarbonate panel.

When 

mark is PS, it’s polycarbonate panel (SI)

When 

mark is CP, it’s the heat protection 

polycarbonate panel.

When 

mark is CH, it’s heat protection FRP (SI)

Содержание PJR Series

Страница 1: ...ilding roof directly There is a possibility that products are damaged by snow falling When installing it besides concrete wall etc keep the enough clearance between the product and the wall due to not clash each other during strong wind Do not install it in the place where the strong wind blows up the roof When installing it recommending to installing its front frame face to the building due to re...

Страница 2: ...e the posts and damage them if the water freezes and expands inside 2 Immediately wipe off any mortar or stains from the surface of aluminum parts since they may cause corrosion water drainage hole Be sure to put the sealant glue as the following Please prepare the sealing materials on site 1 Wipe off any stains from the sealing part 2 Be sure to apply a sealant as specified 3 After putting the se...

Страница 3: ...15 3 G L G L G L G L G L 43 size 50 size 57 size 57 size 50 size Length dimension W and post standard position Post could be changed as the dimension of Dimension position of posts and base dimension Dimension position of post For D36 to D60 Wide beam For D72 D80 triple type 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 ...

Страница 4: ...515 H23 2965 H28 3465 140 140 140 140 140 150 150 140 H 100 H18 1900 H23 2350 H28 2850 H 100 H18 1900 H23 2350 H28 2850 H 100 H18 1900 H23 2350 H28 2850 H 100 H18 1900 H23 2350 H28 2850 H 100 H18 1900 H23 2350 H28 2850 H 100 H18 1900 H23 2350 H28 2850 H 98 H18 1898 H23 2348 H28 2848 H 98 H18 1898 H23 2348 H28 2848 H 245 H18 2045 H23 2495 H28 2995 H 263 H18 2063 H23 2513 H28 3013 H 326 H18 2126 H23...

Страница 5: ...h direction Depth direction Length direction Please install under below condition in case of concrete floor Thickness of concrete floor is more than 100mm Steel rod and welding wire net are arranged in concrete floor Dimension of projection which prevents floating at 4 rounds is more than 50mm 50mm Distance A from outside edge of base to around concrete floor is more than dimension specifications ...

Страница 6: ... PJRH 28F 1 PJRH 28G 1 PJWT 54B 2 PJWT 60C 2 PJWT 51E 2 PJWT 54E 2 PJWT 60E 2 PJTT 72E 3 PJTT 80E 3 Section Parts ID Main frame type PJWY W50A 4 PJWY W57A 4 PJWY W43B 2 PJWY W43B 3 PJWY W50C 2 PJWY W50C 3 PJWY W43E 4 PJWY W50E 4 PJWY W57E 2 PJWY W57E 3 PJWY W57E 4 Section Parts ID Beam type PJWT 36A 2 PJWT 42A 2 PJWT 48A 2 PJWT 51A 2 PJWT 54A 2 Section Parts ID Type Component parts Post Beam Main ...

Страница 7: ...antity 2 1 PJWY W43B 2 PJWY W43B 3 PJWY W43E 4 PJWY W50A 4 PJWY W50C 2 PJWY W50C 3 PJWY W50E 4 PJWY W57A 4 PJWY W57E 2 PJWY W57E 3 PJWY W57E 4 12 18 24 28 14 21 28 32 16 24 32 Length set PJWY W43B 2 PJWY W43B 3 PJWY W43E 4 PJWY W50A 4 PJWY W50C 2 PJWY W50C 3 PJWY W50E 4 PJWY W57A 4 PJWY W57E 2 PJWY W57E 3 PJWY W57E 4 Gutter Main frame Panel holder middle L 645 Panel holder end L 300 Round gutter G...

Страница 8: ... retainer end Small truss screw 5 10 10 10 12 14 10 12 14 88 84 103 98 118 113 101 96 118 113 134 129 113 108 132 127 151 146 134 129 149 144 172 167 187 182 191 186 214 209 147 142 164 159 189 184 206 201 210 205 235 230 361 359 395 390 160 155 179 174 206 201 225 220 229 224 256 251 397 392 435 430 PJWU 43 PJWU 50 PJTU 50 PJWU 57 PJTU 57 PJWU 43 PJWU 50 PJTU 50 PJWU 57 PJTU 57 PJWU 4336 PJWU 434...

Страница 9: ...077 Gutter cap GB8075 Rain water cover GB8078 Gutter attachment GA4929 Gasket GA4930 11 10 Caution label GLZ20C Snow label HY0177 Product name label HY0173 Drilling screw 4 10 8 Glue GA4934 Assembling manual Beam connecting bracket GB8079 Support plate GB8080 Middle frame cap GB8076 Hexagon bolt M8 85 22 Cap nut M8 Washer M8 Spring washer M8 Roof panel GB4107 Polycarbonate AO BR GB8224 Polycarbona...

Страница 10: ...e installation procedure 1 Installation of posts and beams 2 Installation to base hole Insert the post into the base hole and fix with support stand not to fall down Step1 Check if it is flat and vertical and cast concrete Step2 Install as the side which the caution label is attached comes inside Beam Beam connecting bracket Parts box Washer M8 Parts box Beam Hexagon bolt M8 85 22 Parts box Washer...

Страница 11: ...w 5x10x10 and put the product name label to the gutter 3 Attaching the post cap In case of installing the post other than the post standard position Make the hole φ5 5 adjusting the post position and screw it Put the hole seals on the unnecessary holes 4 Installation of gutter Hole seal Parts box Gutter Small truss screw 5 10 10 Roof rafter set Caution label Parts box Snow caution label Parts box ...

Страница 12: ...les of middle frame fin and pre holes on the beam Be careful of the kind of screws Step2 5 Installation of middle frame In case of installing the post other than the post standard position Make the hole φ5 5 adjusting the post position and screw it Put the hole seals on the unnecessary holes For D36 to D60 Wide beam For D72 D80 triple type Middle frame cap Parts box Support plate Beam connecting b...

Страница 13: ... put the hole seals on the unnecessary hole B figure A figure B figure A view drawing Attach the roof panel cushions adjusting the gutter part Push the cushion onto the top face and attach it firmly not to be come off Attach the roof panel cushions on the mark off lines of top face of all the main frames 6 Attaching the roof panel cushions 7 Installation of main frame G u t t e r s i d e M a i n f r...

Страница 14: ...me Install the side frame to the gutter and main frames using guide holes with drilling screws 4x10x8 Step2 Insert the side frame into the middle frame and gutters and fix with drilling screws 4x10x8 Step2 Attach the gutter cap into the gutter Step1 8 Installation of side frame After installing step2 do sealing work to the gutter Step3 Detailed figure of the sealing part indicates the sealing part...

Страница 15: ...he processing parts B part detailed drawing C part detailed drawing Screw it guiding the U shape gutter of the gutter at B part step2 Screw it guiding the U shape gutter of the main frame at C part step3 Screw it guiding the U shape gutter of the middle frame at A part step1 Set the roof rafter to the processing part of the middle frame Strike the end to the guide fin of the middle frame and screw...

Страница 16: ...d drawing When installing roof panels please be noted below 10 Installation of roof panels Before installing the roof panels Insert the roof panel into the middle frame and then set on the gutter side Adjust the roof panel end to the U shape gutter Sort the panel equally right and left Otherwise the expansion of panels resulting from temperature changes causes the noise In case of polycarbonate SI...

Страница 17: ...ngth set Gutter Side frame Gutter Panel holder middle Panel holder end Roof rafter Position of the panel holder 11 Installation of panel holder Install the panel holders adjusting the U shape gutter of gutter frame as a guide and fix with drilling screw 4x10x8 Insert the processing part of panel holder to the roof rafter middle and install it ...

Страница 18: ...d side frames When screwing the roof retainer end insert the end part of roof retainer into the gutter cap before screwing the second screw from the post side A part detailed figure Do sealing work to the insert part of roof retainer end into middle frame Step2 Step3 Step3 12 Installation of roof retainer Insert the end of roof retainer into the middle frame and fix from the middle frame side with...

Страница 19: ... Panel support set Side frame Roof retainer Roof panel support Panel support set Gutter Gutter Gutter Install the panel supports with small truss screw 5x15x10 Overlap the panel supports and install with small screw 5x18x12 For D72 and D80 install the panel support adjusting the holes of roof retainers Step1 Step2 For D72 install the panel support at the position of 5th and 9th hole from gutter Fo...

Страница 20: ...side Crush the drain part with wood hammer and driver at the position for installing gasket In case that it could not crush use electric drill and hit the part again Screw the gutter attachment and do sealing work at the screw part Be sure to seal around screws in order to prevent danger when cleaning as well as for water proof Use glue in the parts box for rain gutter parts Blinder side Gutter si...

Страница 21: ...X2 100mm XA 51 Depth 36 42 48 51 54 60 72 80 Cutting length mm Not available Roof cutting dimension X1 X2 100mm XA 51 In case of wide beam cut the beam at the same dimension from both ends Decide the cutting length depending on the cutting roof dimension In case of wide beam cut the beam at the same dimension from both ends Decide the cutting length depending on the cutting roof dimension 14 Cutti...

Страница 22: ...hole In case the dimension is less than 80mm the hole processing doesn t need 1 Decide the cutting length depending on the cutting roof dimension 2 In case the dimension from end is more than 50mm make a hole In case the dimension is less than 50mm the hole processing doesn t need 4 Roof retainer middle processing 5 Roof retainer end processing 3 Roof rafter processing After processing install the...

Страница 23: ...g roof panel 6 Cutting roof panel support 2 Middle frame processing Cut the materials as the same length as the cutting dimension of the roof Y 1 Gutter processing Cut the materials as the same length as the cutting dimension of the roof Y 15 Cutting procedures of length direction The panel span is 715mm In case of cutting on length direction the cutting dimension of the roof Y is the multiples of...

Страница 24: ... Y 2 Y 3 7 0 Be careful of the direction of each materials There are right and left directions 3 Main frame processing 4 Panel holder processing Cut the panel holder end and panel holder middle at the cutting length Y referring to the right table In case that the hole overlaps the pre hole the hole processing doesn t need 5 Roof panel cutting 6 Roof panel support processing Cut the materials as th...

Отзывы: