![HobbyKing SBACH 55](http://html.mh-extra.com/html/hobbyking/sbach-55/sbach-55_instruction-manual_2142813007.webp)
Nut
Washer 2x6mm
Screw 2x10mm
Collar
Install the control horn and connect the linkage.
Epoxy the control horn to the slots in the elevator,assemble the
elevator servo to the fuselage as illustration.
Make sure hinges are
mounted in the same line.
6
Pin hinge(24x24mm)
Glue the pinned hings to appropriate slots.
1mm
Trailing
edge
Make sure they are in
the right position while
installing.
Elevator
Keep about 1mm width space between the tailing edge
and elevator.
Insert carefully the elevator through the fuselage.
Trim the covering carefully to appropriats position in the stabilizer
and insert it into fuselage space and cheek the alignment.
4
TP Screw (2.3x12mm)
15
14
13
5
12
11
10
The sketch map of how the steel wires works for the
rudder.
Make sure to glue securely.
If not properly glued, a failure in flight may occur.
Temporarily fasten down the main wing and
check its correct position.
Securely glue together.If coming off during flights,
you'll lose control of your airplane which leads
to accidents!
The sketch map should be when the rudder and stabilizer
install completion.
A = A ’
B = B ’
Accessory list for the coming installation steps.
The front view once the engine install completion.
The side view once the engine install completion.
Drill four holes at the diameters as shown for engine
mount.
4
Blind Nut (4mm)
113mm
4
Blind Nut (4mm)
1
Engine mount (52x86mm)
Linkage Stopper
4
4
20
4
Washer(4x8mm)
Screw (4x35mm)
Spring Washer (4mm)
Nut (4mm)
2
12
Screw (4x20mm)
2
Plastic tube (2x400mm)
1
Rod (2x300mm)
Fuel tank (260cc)
1
Motor mount box
1
Cable tie
2
A
A ’
B
B ’
5.2mm
Blind Nut
28
29
27
30
31
8