![HobbyKing SBACH 55](http://html.mh-extra.com/html/hobbyking/sbach-55/sbach-55_instruction-manual_2142813005.webp)
8
2
2
Rod (2x300mm)
TP Screw (2.3x12mm)
Collar (2mm)
2
2
2
2
2
Screw (2x10mm)
Nut (2mm )
Clevis
Control horn
Washer(2x6mm)
8
Pin hinge(24x24mm)
8
Pin hinge(24x24mm)
Apply instant type CA glue to aileron and pin hinge.
Make sure hinges are
mounted in the same line.
1mm
Aileron
Trailing
edge
Make sure they are in
the right position while
installing.
Keep some space about 1mm width between aileron and
trailing edge.
Assemble the aileron to main wing with instant type
CA glue.
Securely glue together. If coming off during flights, you 'll
lose control of your airplane which leads to accidents!
Install the control horn and connect the linkage.
TP Screw (2.3x12mm)
Apply instant type AB glue to the control horn and the slots in
the aileron, insert the control horn to the slots as illustration.
Nut
Washer 2x6mm
Screw 2x10mm
Collar
Accessory list for the coming installation steps.
1
2
3
4
5
3
Mount the receiver and the battery to appropriate position
in the fuselage.
Assemble the servo of the throttle in the fuselage.
The consumers can also use motors for this plane.please find the
assemble steps below.The front view when the motor install completion.
motor dimension O 42x50mm
The side view when the motor install completion.
108mm
Base on the 31st step,drill four holes in appropriate
position.
4mm
Fix the motor mount box to the fuselage with screws.
Washer (4x8mm)
Screw (4x20mm)
39
38
43
10
40
42
41