1
Main landing gear
Motor mount box
2
Wheel(50mm)
1
Wheel(30mm)
20
7
4
6
Screw (3x16mm)
4
8
8
Screw (2x10mm)
8
4
22
8
12
6
2
4
Lock Nut (4mm )
Screw (3x15mm)
Screw (4x20mm)
Screw (4x35mm)
2
Screw (4x40mm)
Blind Nut(4mm)
2
Blind Nut(3mm)
TP Screw (2.3x12mm)
Collar (2mm)
Nut(4mm )
Nut(2mm )
Washer(2x6mm)
Washer(3x6mm)
Washer(4x8mm)
4
Washer(4x12mm)
Spring Washer(4mm)
Package1
3
Rod (2x300mm)
2
2
Engine mout
(52x86mm)
1
1
Double-sided adhesive(410mm)
Cable tie
2
Steelwire
(0.5x1200mm)
4
Copper joiner
4
Aluminum tube
(
3x6mm
)
SBACH 55” packing list
1
Taillanding gear (2mm)
1
Main wing joiner(16x534mm)
5
Control horn(2mm)
1
Aluminum plate
Linkage Stopper
7
Clevis(2mm)
1
2
Plastic tube (2x400mm)
Fuel tank (260cc)
1
1
Rod (2x300mm)
Package4
Package5
Package2
Package3
2
Assemble the motor as below.
Washer (4x8mm)
Screw (4x20mm)
Li-Pox4 (2000mAh)
Assemble the Li-Po battery to appropriate position in
the fuselage.
2
1
Blind Nut (3mm)
Main landing gear
Washer (4x12mm)
Washer (3x6mm)
8
6
Screw (3x15mm)
Screw (4x40mm)
Wheel (50mm)
2
4
4
2
Nut(4mm)
LockNut (4mm)
2
2
Accessory list for the coming installation steps.
Screw (3x16mm)
4
TP Screw (2.3x12mm)
Double-sided adhesive
PVC
2
1
Washer (4x12mm)
Washer (3x6mm)
Washer (4x12mm)
Nut (4mm)
Screw (4x40mm)
Screw (3X16mm)
Lock Nut (4mm)
Assemble the wheels and wheel pants to the landing
gears with screws.
4.2mm
Blind Nut
Drill holes to appropriate position in the wheel pants,
fixing the wheel pants to the landing gear with screws.
Adjust to appropriate distance based
on the hole in the aluminum plate
of the landing gear
2
2
4
2
Washer (4x12mm)
Screw (4x40mm)
Nut 4mm)
2
Lock Nut (4mm)
The sketch map when the wheels and wheel pants install
completely.
Screw (3x16mm)
appropriate distance
2
Collar (4mm)
46
47
48
11
44
45