Slide four panels
1
on to profiles
12
as shown.
Repeat for other side.
21
1
1
1
1
Roof Assembly
Slide two profiles
12
-1190mm along the top
long sides of the greenhouse. Insert a
joining bar
10
between
each pair to strengthen
the join.
Panels may need
aligning as
you go.
20
12/1190
10
23
22
10
10
10
12/1190
13/575
11/590
12/1190
From inside the greenhouse and
starting at one end, insert a profile
13
-575mm to lock panels
5
and
1
together.
Then insert three
11
-590mm
profiles between the roof
panels to lock them together.
Finally, finish off by inserting
another profile
13
-575 at the
corner.
Repeat for the other side of the
roof.
Slide on two roof profiles
12
-1190 on either side.
You may need a stable
step ladder at this stage.
Insert a joining bar
10
between each pair to
strengthen the joint.