16
2
18/550
15/550
15/550
10C/120
10C/120
4
10C/120
8
14
15
Door
4
2
11/1100
13
11
11/1290
10A/100
11/920
11/920
11/1290
11/920
11/920
10C/120
10C
Door frame
Note orientation
Note
orientation
View from front, right of door
frame and door jam.
Door jam
Door frame
10A/100
10A/100
Note:
You will require the assistance of another person to carry out the next stage of the
assembly. You will be lifting the greenhouse and sliding six bottom rail profiles
11
onto the
bottom panels. There are three different panel length profiles
to use so study the diagram
below closely.
Once all the bottom rail profiles
are fitted, tap down all the
vertical profiles using a rubber
mallet. The vertical profiles
11
should sit on the bottom rail
profiles and the corner profiles
13
sit on the floor or ground.
The front of the greenhouse
does not get a bottom rail at
this time.
Slide the top panel
4
onto
the top of the door assembly.
Slide a Door Frame
Extension
15
-550mm profile
onto the top door panel,
ensuring it engages with
the inner metal connector
bar
10C
.
The other
15
-550
profile will serve as a
Door Jam Extension.
Slide it onto outer
metal connector
bar
10C
.
Top of Door
Insert four metal connector bars
10C
/120mm into the top of
the door profiles as shown. Slide the Door Frame and Door
Jam Extension Assembly profile
18
-550mm onto the
hinged side of the top of the door panel, ensuring that it
slides onto the metal bars
10C
.
Door jam