OM-2228 / Operation and Maintenance Manual
120CU20 / Series 500120 / 400 Hz. Generator Set
October 15, 2013
Chapter 3-2
Page 7
6) Run-in and Periodic Check.
a)
Mount the engine-generator assembly in a suitable test area and operate it for a 2-hour run-in.
b)
Shut down the engine after 2 hours and re-torque all coupling bolts to 85 foot-pounds
(115 N-m)
to
compensate for normal torque relaxation.
c)
Return the unit to normal service.
d)
After 200 hours of operation, check all coupling bolts with a torque wrench set at 85 foot-pounds
(115
N-m).
e)
Return the unit to normal service.
f)
After each additional 2,000 hours of operation
(or every year),
recheck all coupling bolts to maintain
the same torque value.
Содержание 120CU20
Страница 2: ... ...
Страница 4: ... ...
Страница 205: ......
Страница 206: ......
Страница 207: ......
Страница 208: ......
Страница 209: ......
Страница 210: ......
Страница 211: ......
Страница 212: ......
Страница 213: ......
Страница 214: ......
Страница 215: ......
Страница 216: ......
Страница 217: ......
Страница 218: ......
Страница 219: ......
Страница 220: ......
Страница 221: ......
Страница 222: ......
Страница 223: ......
Страница 224: ......
Страница 225: ......
Страница 226: ......
Страница 227: ......
Страница 228: ......
Страница 229: ......
Страница 230: ......
Страница 231: ......
Страница 232: ......
Страница 233: ......
Страница 234: ......
Страница 235: ......
Страница 236: ......
Страница 237: ......
Страница 238: ......