Test Receptacle Connector Terminals Identification
Figure 2
B. Operational Test Procedures
(1) Start the engine in accordance with instructions in 1-3; Para. 2, A thru C.
(2) Check operation of engine instruments: DC ammeter
(17, Fig. 1),
coolant temperature indicator
(21),
oil pressure gage
(23),
and hourmeter
(19).
(3) Check engine idle speed. Should be 825 to 875 RPM. Adjust, if necessary, in accordance with in-
structions in Engine Operator’s Manual.
NOTE: A stroboscope is required for this check.
(4) Again check for oil, fuel, and coolant leaks and correct any leaking condition.
(5) Position switches and controls for automatic voltage regulation and power delivery as follows:
(a) Place automatic-manual switch
(33, Fig. 1)
in AUTOMATIC position.
(b) Place test-bank switch
(34)
in AIRCRAFT position.
(c) Meter switch
(5)
may be in any position except pointing straight down.
(d) If the adjustment of the voltage regulator rheostat
(See TM-759/OM-2020)
has been dis-
turbed, position the knob to mid-range position.
(6) Bring the engine up to governed speed and also energize the generator by holding the engine-gen-
erator control switch
(18)
in BUILD-UP-VOLTS position momentarily. Release switch and allow it to
position in “center” RUN position.
If the engine “comes-up” to governed speed and a voltage value appears on the voltmeter
(2),
the
electric governor and excitationdeenergization relay circuits are functioning.
(7) Observe frequency meter
(1).
If engine speed is properly adjusted, frequency will be exactly 400
Hz. If not, adjust engine governed speed. See Fig. 8.
(8) Observe voltmeter
(2).
Use rheostat to adjust voltage to 115 V AC.
OM-2028
June 20/89 Revised
2-3
Page 5
Содержание 6910
Страница 2: ...This page intentionally left blank ...
Страница 14: ...This page intentionally left blank OM 2028 Introduction June 20 89 Revised Page 2 ...
Страница 40: ...This page intentionally left blank OM 2028 1 1 May 1 91 Revised Page 26 ...
Страница 66: ...Engine Control Panel in Tilt out Position Figure 6 OM 2028 2 1 August 31 90 Revised Page 12 ...
Страница 72: ...This page intentionally left blank OM 2028 2 2 June 20 89 Revised Page 6 ...
Страница 100: ...Test Receptacle Connector Termi nals Identification Figure 4 OM 2028 3 1 June 20 89 Revised Page 8 ...
Страница 128: ...Generator Set Figure 1 OM 2028 4 3 May 1 91 Revised Page 2 ...
Страница 130: ...Canopy Assembly Figure 2 OM 2028 4 3 May 1 91 Revised Page 4 ...
Страница 132: ...This page intentionally left blank OM 2028 4 3 May 1 91 Revised Page 6 ...
Страница 134: ...Generator Set Without Canopy Figure 3 OM 2028 4 3 May 1 91 Revised Page 8 ...
Страница 136: ...This page intentionally left blank OM 2028 4 3 May 1 91 Revised Page 10 ...
Страница 138: ...Radiator and Cooling System Group Figure 4 OM 2028 4 3 May 1 91 Revised Page 12 ...
Страница 140: ...Air Cleaner Assembly For units manufactured before and during August 1990 Figure 5 OM 2028 4 3 May 1 91 Revised Page 14 ...
Страница 142: ...Electric Governor Kit Figure 6 OM 2028 4 3 May 1 91 Revised Page 16 ...
Страница 144: ...Fuel Lines Assembly Figure 7 OM 2028 4 3 May 1 91 Revised Page 18 ...
Страница 146: ...Oil Line Assembly Figure 8 OM 2028 4 3 May 1 91 Revised Page 20 ...
Страница 148: ...Stator Terminal Panel Assembly Figure 9 OM 2028 4 3 May 1 91 Revised Page 22 ...
Страница 150: ...Power Module Panel Assembly Figure 10 OM 2028 4 3 May 1 91 Revised Page 24 ...
Страница 152: ...Control Box Assembly Figure 11 OM 2028 4 3 May 1 91 Revised Page 26 ...
Страница 154: ...Generator Controls Tray Assembly Figure 12 OM 2028 4 3 May 1 91 Revised Page 28 ...
Страница 156: ...Protective Relays Tray Assembly Figure 13 OM 2028 4 3 May 1 91 Revised Page 30 ...
Страница 158: ...Control Box and Internal Components Group Figure 14 OM 2028 4 3 May 1 91 Revised Page 32 ...
Страница 160: ...Engine Control Panel Assembly Figure 15 OM 2028 4 3 May 1 91 Revised Page 34 ...
Страница 162: ...This page intentionally left blank OM 2028 4 3 May 1 91 Revised Page 36 ...
Страница 164: ...Output Terminal Board Assembly Figure 16 OM 2028 4 3 May 1 91 Revised Page 38 ...
Страница 166: ...Generator Assembly Figure 17 OM 2028 4 3 May 1 91 Revised Page 40 ...
Страница 168: ...Mounting Frame Assembly and Lifting Yoke Figure 18 OM 2028 4 3 May 1 91 Revised Page 42 ...
Страница 170: ...Water Heater Figure 19 OM 2028 4 3 May 1 91 Revised Page 44 ...
Страница 172: ...This page intentionally left blank OM 2028 4 3 May 1 91 Revised Page 46 ...
Страница 174: ...This page intentionally left blank OM 2028 5 0 May 1 91 Revised Page 2 ...
Страница 176: ...This page intentionally left blank OM 2028 6 0 June 20 89 Revised Page 2 ...
Страница 177: ... I I I I I l zE I I 01 39NVN jlOVlQ t __ ...
Страница 178: ......
Страница 179: ......
Страница 180: ......
Страница 181: ......
Страница 182: ......
Страница 183: ......
Страница 184: ......
Страница 186: ......
Страница 187: ......
Страница 188: ......
Страница 189: ......
Страница 190: ......
Страница 191: ......
Страница 192: ......
Страница 193: ......
Страница 194: ......
Страница 195: ......
Страница 196: ......
Страница 198: ......
Страница 199: ......
Страница 200: ......
Страница 201: ......
Страница 202: ......
Страница 203: ......
Страница 204: ......
Страница 205: ......
Страница 206: ......