HMF Leofant 32 ABB2570 Скачать руководство пользователя страница 8

© HMF, 48336 Sassenberg-Füchtorf

 

Page 8 

 

4.  Remarks to the road safety  

 

While  using  public  roads  and  ways  the  combination  of  tractor  and  asparagus  dam-
former must fulfil the rules of road traffic. 
You have to pay attention to the maximum axle load and the maximum load capacity on 
the tire of the tractor gets not overstepped.   
You  have  to  prevent  the  machine  from  swinging  while  the  driving  by  fixing  the  lower 
fixing points.  
After the working you have to prevent that the public streets will be polluted with soil.  
 
 

5.  Using possibilities 

 
The  dam-former  Leofant  has  to  be  used  only  as  agreed.  You  can  build  with  the  dam-
former  Leofant  in  one  or  in  several  processes  asparagus  dams.  This  machine  is  also 
suitable for re-building the dams during the harvesting-season.  
 
 

6.  Functioning 

 
With our dam-former Leofant you can build every form of a dam desired with every kind 
of  soil.  Two  counter-rotating  double-stars  of  screwed  square  sticks  make  sure  the 
evenly, clod-free building of the asparagus dam. The dam-formers are adjustable in the 
height and in the width. The asparagus dam is build up from bottom to top and therefore 
it  is  very  solid  and  durable  against  heavy  rain.  With  two  adjustable  supporting  wheels 
you  have  a  regular  depth  control.  Metal  soil  leveller  mounted  behind  the  supporting 
wheels make the driving lines optimally level. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание Leofant 32 ABB2570

Страница 1: ...Instruction manual Dam former LEOFANT 32 ABB2570 Producer HMF Hermeler Maschinenbau GmbH Lohmannstr 4 D 48336 Sassenberg F chtorf Telefon 0049 0 54 26 53 84 Fax 0049 0 54 26 53 85 E Mail info hmf her...

Страница 2: ...ber 2 Type 3 Construction year Machine number type and construction year are hammered into the identification plate at the right front side of the machine Descriptions left or right are always meant i...

Страница 3: ...ty 8 5 Using possibilities 8 6 Functioning 8 7 Starting up 9 7 1 Mounting to the tractor 9 7 1 1 Adjustments 9 7 2 Milling of an asparagus dam 9 7 3 Reworking of the asparagus dam 12 8 Maintenance and...

Страница 4: ...s cultivation then your Leofant will always perform good work 2 General Remarks 2 1 Attention All people who would use care or control the dam former Leofant have to read comprehend and pay attention...

Страница 5: ...on It is not allowed to stay in the dangerous area Before every use do switch the handles for the lifter and the PTO shaft to 0 Approximately 10 hours after starting up you have to check and if necess...

Страница 6: ...ecurity advices before starting on In case of all maintenance and working of repairs stop the motor and remove the ignition key Don t stay in the working area while using the lifter While using the ma...

Страница 7: ...rg F chtorf Page 7 There is danger of contusion Caution There is danger of hurled out pieces while machine is running Pay attention to keep a safe distance to the machine Don t stay in the swerving ar...

Страница 8: ...used only as agreed You can build with the dam former Leofant in one or in several processes asparagus dams This machine is also suitable for re building the dams during the harvesting season 6 Funct...

Страница 9: ...els behind the tractor You have fix the lower links in that way that while working on the field a tolerance of 1 cm on both sides is possible Now put on the PTO shaft The minimum covering of the profi...

Страница 10: ...the dam With another spindle image 3 pos 2 and 3 you can adjust the compression inside the dam The front tins optional should have been adjusted in a position to loosen and level the area directly be...

Страница 11: ...supporting wheels now each one turn higher Now you should check the form of the dam again A further modification of the dam height has now to happen simultaneously at the adjustment for the wheels ima...

Страница 12: ...ructions to work successful with it The lower end of this triangle should be adjusted approx 2 5 cm above the edge of the dam former Nr 2 By having this adjustment the triangle is able to spread the s...

Страница 13: ...ntal the spring tines must be adjusted so that the upper layer of dry sand trickles down to the dam sole The following spike drums mix the dry ground when raising the dams with damp soil and there res...

Страница 14: ...ave to been absolutely respected The lubrication points image 4 1 and 2 and the PTO shaft have to been lubricated every 20 hours Image 4 While re lubrication there might get some lubricant into the so...

Страница 15: ...propulsion for the driving and for the rotors Every 20 working hours you also have to check this for leakage and filling quantity The quantity of the oil is enough when you can see the oil in the loo...

Страница 16: ...FANT Standard PLEASE PAY ATTENTION Dam former in moving direction right You have to see the screw with the bolt Dam former in moving direction left You have to see the heads of the screws Please tight...

Страница 17: ...t 32 2570 to which this declaration refers is satisfying the relevant elementary requirements of security and health of the EG directive 89 392 EWG in the version of the third modified directive 93 68...

Отзывы: