HMF Leofant 32 ABB2570 Скачать руководство пользователя страница 2

© HMF, 48336 Sassenberg-Füchtorf

 

Page 2 

 

Dear Customer! 

 
The 

dam-former  Leofant  32  ABB2570 

is  a  product  of  high  quality  coming  from  the 

Hermeler company. 
 
Please  read  carefully  and  follow  the  instruction  manual  to  be  able  to  use  all  the 
advantages of your new machine.  
We have to refuse warranty claims, which are attributed to operating errors.  
 
Please give us the following information’s in each case of ordering replacement parts: 
 

1. Machine number 
2. Type

 

3. Construction year 

 

 
Machine number, type and construction year are hammered into the identification plate 
at the right front side of the machine.  Descriptions “left” or “right” are always meant in 
moving direction.  
 
You have to apply only original spare parts of our company.  
 

Specifications 

 
 

Type 

 

Dam-former  
Leofant 32 ABB2570 

 

Total width    

~ 2650 mm 

 

Total height   

~ 1390 mm 

 

Total length (without 

         additional parts) 

 

~ 1650 mm 

 

Total weight   

~1600 kg 

 

Needed power  

 

~ 120 PS 

 

Propulsion:    

mechanical by PTO drive 
shafts  

 

Width of the dam top  

300-600 mm 

 

Lower width of the dam   

800-1300 mm 

 

Height of the dam    

300-800 mm 

 
Right of technical modifications reserved  

 

     

 

 

 

 

 

Содержание Leofant 32 ABB2570

Страница 1: ...Instruction manual Dam former LEOFANT 32 ABB2570 Producer HMF Hermeler Maschinenbau GmbH Lohmannstr 4 D 48336 Sassenberg F chtorf Telefon 0049 0 54 26 53 84 Fax 0049 0 54 26 53 85 E Mail info hmf her...

Страница 2: ...ber 2 Type 3 Construction year Machine number type and construction year are hammered into the identification plate at the right front side of the machine Descriptions left or right are always meant i...

Страница 3: ...ty 8 5 Using possibilities 8 6 Functioning 8 7 Starting up 9 7 1 Mounting to the tractor 9 7 1 1 Adjustments 9 7 2 Milling of an asparagus dam 9 7 3 Reworking of the asparagus dam 12 8 Maintenance and...

Страница 4: ...s cultivation then your Leofant will always perform good work 2 General Remarks 2 1 Attention All people who would use care or control the dam former Leofant have to read comprehend and pay attention...

Страница 5: ...on It is not allowed to stay in the dangerous area Before every use do switch the handles for the lifter and the PTO shaft to 0 Approximately 10 hours after starting up you have to check and if necess...

Страница 6: ...ecurity advices before starting on In case of all maintenance and working of repairs stop the motor and remove the ignition key Don t stay in the working area while using the lifter While using the ma...

Страница 7: ...rg F chtorf Page 7 There is danger of contusion Caution There is danger of hurled out pieces while machine is running Pay attention to keep a safe distance to the machine Don t stay in the swerving ar...

Страница 8: ...used only as agreed You can build with the dam former Leofant in one or in several processes asparagus dams This machine is also suitable for re building the dams during the harvesting season 6 Funct...

Страница 9: ...els behind the tractor You have fix the lower links in that way that while working on the field a tolerance of 1 cm on both sides is possible Now put on the PTO shaft The minimum covering of the profi...

Страница 10: ...the dam With another spindle image 3 pos 2 and 3 you can adjust the compression inside the dam The front tins optional should have been adjusted in a position to loosen and level the area directly be...

Страница 11: ...supporting wheels now each one turn higher Now you should check the form of the dam again A further modification of the dam height has now to happen simultaneously at the adjustment for the wheels ima...

Страница 12: ...ructions to work successful with it The lower end of this triangle should be adjusted approx 2 5 cm above the edge of the dam former Nr 2 By having this adjustment the triangle is able to spread the s...

Страница 13: ...ntal the spring tines must be adjusted so that the upper layer of dry sand trickles down to the dam sole The following spike drums mix the dry ground when raising the dams with damp soil and there res...

Страница 14: ...ave to been absolutely respected The lubrication points image 4 1 and 2 and the PTO shaft have to been lubricated every 20 hours Image 4 While re lubrication there might get some lubricant into the so...

Страница 15: ...propulsion for the driving and for the rotors Every 20 working hours you also have to check this for leakage and filling quantity The quantity of the oil is enough when you can see the oil in the loo...

Страница 16: ...FANT Standard PLEASE PAY ATTENTION Dam former in moving direction right You have to see the screw with the bolt Dam former in moving direction left You have to see the heads of the screws Please tight...

Страница 17: ...t 32 2570 to which this declaration refers is satisfying the relevant elementary requirements of security and health of the EG directive 89 392 EWG in the version of the third modified directive 93 68...

Отзывы: