2
INITIAL SETUP / INSTALLATION
INSTALLATION AND SET UP INSTRUCTIONS
1. Leg
Assembly
A) Remove four nuts on inside of dryer frame that secures the dryer
to crate bottom.
B) Raise dryer from crate bottom with forklift to allow access to four
corner posts.
C) Insert legs to paint line.
D) Secure each leg bolt, lower forklift to allow dryer to rest on legs.
2. Top Exhaust Blower Motor
A) Secure housing to dryer top using provided #14 x 1/2” HEX head
tap screws with #14 Star Washer.
B) Attach black wires to fl ex conduit tan colored wires using orange
wire nuts. Polarity is not important.
3. Bottom Blower Motor
A) Secure to bottom of dryer using 4 Greer lock nuts. Align point of
arrow in motor plate to point of arrow on bottom of dryer.
B) Match wire numbers of blower motor to fl ex conduit tan colored
wires using orange wire nuts. Polarity is not important. Also attach
the two green ground wires together.
4. Duct
Work
A) Run duct from the exhaust stack on the dryer to the outside of
building. Install a rain cap to prevent water damage to the dryer.
Maximum duct length 30 feet ( 9 meters) from dryer to where it ex-
ists the building. If longer duct runs are required a booster fan must
be installed.
5. Extensions
A) If the oven is shipped to you crated, remove the extension and
cooler section from the crate and mount to the oven body.
B) Plug the gear motor and encoder plugs into their respective recep-
tacles on the exit end of the oven.
6. Conveyor
Belt
A) Refer to the separate instructions supplied with the wire belt to
show the proper installation and splicing of the wire belt ends back
together.
11
NOTES