CCHA/ECHA – CCHBA/ECHBA
Installation, operation and maintenance instructions
5
RECEPTION
INSPECTION UPON RECEIPT
•
Units are delivered with special protective packing; therefore when it arrives, please inspect it
carefully to check that no damage has occurred during transport and that the unit has been
supplied complete with all parts specified in the order. If any damage is found, immediately file
a claim with the transport company.
•
Verify the correct voltage of the nameplate and make sure it’s in accordance with local power
supply.
•
In case of any flaw or anomaly detected, please contact HITECSA
RIGGING
•
Before moving the unit, make sure that all panels are well fixed.
•
Raise and set down the equipment carefully.
•
Do not tilt the unit more than 15 degrees during transportation.
When lifting the unit, make sure that it’s balanced and stable; bear in mind that the heaviest part is
where the compressor is installed.
STORAGE
If the equipment is going to be stored please follow the instructions below in order to avoid
damages, corrosion or deterioration:
•
Keep the unit away from direct sunlight, rain, sand, wind or temperatures above 50ºC
•
Storage temperature: maximum 50ºC, minimum -10ºC
•
Maximum humidity: 90%