BREAK-IN
2-1
BREAKING IN NEW MACHINE
IMPORTANT: Operating a new machine at full load
without first breaking in can cause
scratches and/or seizures, consequently
affecting the service life of the machine.
Thoroughly perform break-in operation.
The service life and performance of the machine can be
greatly affected by operation and maintenance of the ma-
chine during the initial stage of operation. Perform break-in
operation with the engine output less than 80% of the
maximum output for the first 50 hours.
Содержание ZX27U-2
Страница 1: ......
Страница 8: ...CONTENTS MEMO ...
Страница 10: ...MACHINE NUMBERS MEMO ...
Страница 44: ...SAFETY SIGNS S 34 SS 259 SS 2684 SS 2652 SS 024 SS 2639 SS3090482 M1M7 07 021 CANOPY CAB ...
Страница 50: ...SAFETY SIGNS S 40 MEMO ...
Страница 65: ...OPERATOR S STATION 1 15 RADIO Cab Equipped Machines 1 Radio Clock M1M7 01 004 1 ...
Страница 74: ...BREAK IN 2 2 MEMO ...
Страница 120: ...TRANSPORTING 6 6 MEMO ...
Страница 133: ...MAINTENANCE 7 13 6 Swing cylinder 7 Swing post M1M7 07 023 M1M7 07 024 ...
Страница 196: ...MAINTENANCE 7 76 MEMO ...
Страница 200: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Страница 224: ...SPECIFICATIONS 12 20 MEMO ...
Страница 226: ...REFERENCE 13 2 MEMO ...
Страница 230: ...INDEX 14 4 MEMO ...