MAINTENANCE
7-69
Check Tightening Torque of Bolts and Nuts
(ZX40U
-2
, ZX50U
-2
)
--- every 250 hours (first time after 50 hours)
Tighten or retighten all bolts and nuts to the torque val-
ues shown in the Table below. In addition, check bolts
and nuts for looseness and missing parts. If any are
loose or missing, be sure to retighten or supply
new parts. Check tightness after the first 50 hours
then every 250 hours.
Torque
No. Descriptions
Bolt Dia.
mm
Q’ty
Wrench Size
mm
N
⋅
m (kgf
⋅
m)
(lbf
⋅
ft)
1. Engine cushion rubber mounting bolt
12
4
19
88
(9)
(65)
2. Engine bracket mounting bolt (Front)
10
8
17
49
(5)
(36)
3. Hydraulic oil tank mounting bolt
12
4
19
88
(9)
(65)
4. Fuel tank mounting nut
10
3
17
20
(2)
(15)
7/16-20UNF
17 24.5
(2.5)
(18)
19
29.5
(3)
(22)
9/16-18UNF
22 39
(4)
(29)
3/4-16UNF
27 64
(6.5)
(47)
1-1/16-12UNF
36
175
(18)
(129)
Metal face seal fit-
ting for hydraulic
hoses and piping
1-5/16-12UNF
41
205
(21)
(151)
9/16 UNF
19
44
(4.5)
(32)
11/16 UNF
22
74
(7.5)
(55)
5.
Union joints
for hydraulic
hoses and
pipes
ORS
13/16 UNF
27
93
(9.5)
(69)
6. Pump mounting bolt
12
2
10 (Socket)
88
(9)
(65)
7. Pump cover mounting bolt
10
8
17
49
(5)
(36)
Control valve mounting bolt
10
4
17
49
(5)
(36)
8.
Control valve base mounting bolt
10
4
17
49
(5)
(36)
9. Swing device mounting bolt
16
8
24
265
(27)
(195)
10. Battery mounting nut
6
2
10
5
(0.5)
(3.5)
12 5
19
88
(9)
(65)
11. Canopy mounting bolt
10 5
17
49
(5)
(36)
12 5
19
88
(9)
(65)
12. Cab mounting bolt
10 5
17
49
(5)
(36)
Upperstructure 12
27
19
108
(11)
(80)
13. Swing bearing
mounting bolt
Undercarriage 12
24
19
108
(11)
(80)
14. Travel device mounting bolt
14
24
22
175
(18)
(130)
15. Sprocket mounting bolt
14
24
22
175
(18)
(130)
16. Upper roller mounting bolt
16
2
24
231
(23.5)
(170)
17. Lower roller mounting bolt
16
16
24
265
(27)
(195)
18. Track shoe bolt
12
312
19
137
(14)
(101)
6
10
5
(0.5)
(3.5)
8
13
9.8
(1)
(7)
19. Cover mounting bolt
10
17
49
(5)
(36)
20. Counterweight mounting bolt
24
3
36
930
(95)
(398)
10
17
49
(5)
(36)
12
19
88
(9)
(65)
14
22
137
(14)
(101)
16
24
205
(21)
(152)
21. Front pin lock plate bolts
18
27
390
(40)
(290)
22. Side-cutter mounting bolts
14
6
22
175
(18)
(130)
23. Track roller guard mounting bolt
16
12
24
265
(27)
(196)
24. Tilt mechanism floor connection pins
10
1
17
49
(5)
(36)
25. Tilt mechanism support-holding bolts
10
2
17
49
(5)
(36)
26. Tilt mechanism support connection pins
8 1
13
9.8
(1)
(7)
IMPORTANT:
1. Before installing, clean the bolt and nut threads to remove soil, rust, and/or dust.
2. When installing new bolts and/or nuts, apply lubricant (e.g. white zinc B solved into spindle oil) to
the screw threads.
3. Tighten bolts and nuts to the specifications. If tightened with excessively high or low torque,
missing or breakage of bolts and/or nut may result.
4. In case the counterweight mounting bolts became loose, consult your authorized dealer for re-
tightening.
Содержание ZX27U-2
Страница 1: ......
Страница 8: ...CONTENTS MEMO ...
Страница 10: ...MACHINE NUMBERS MEMO ...
Страница 44: ...SAFETY SIGNS S 34 SS 259 SS 2684 SS 2652 SS 024 SS 2639 SS3090482 M1M7 07 021 CANOPY CAB ...
Страница 50: ...SAFETY SIGNS S 40 MEMO ...
Страница 65: ...OPERATOR S STATION 1 15 RADIO Cab Equipped Machines 1 Radio Clock M1M7 01 004 1 ...
Страница 74: ...BREAK IN 2 2 MEMO ...
Страница 120: ...TRANSPORTING 6 6 MEMO ...
Страница 133: ...MAINTENANCE 7 13 6 Swing cylinder 7 Swing post M1M7 07 023 M1M7 07 024 ...
Страница 196: ...MAINTENANCE 7 76 MEMO ...
Страница 200: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Страница 224: ...SPECIFICATIONS 12 20 MEMO ...
Страница 226: ...REFERENCE 13 2 MEMO ...
Страница 230: ...INDEX 14 4 MEMO ...