![Hitachi RPS-140AN Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/hitachi/rps-140an/rps-140an_instruction-manual_2139422014.webp)
Preparation
- 11 -
Preparation
◆
Operation Space for Outdoor Unit
Individual Outdoor Unit
Combined Installation
(1) Horizontal
(2)
2-Unit
Leveled
Installation
(3)
Sequential
Installation
(1) In case of existence of
obstruction on top and
in the back (open
space at front and by
the side).
(2) In case of existence of
obstruction in the back
and by the side (open
space at front and on
top).
(3) In case of existence of
obstruction on the front
(open space in the back,
by the sides and on the
top)
(4) In case of existence
of obstruction in the
back and on the front
(open space by the
sides and on the top)
(5) In case of existence of
obstruction in the
surrounding (open
space on top)