3.2 Installation
3.2.1 Opening of False Ceiling and Suspension Bolts
1
Determine the final location and direction of installation of the indoor unit paying careful attention to the
space for the piping,
wiring and maintenance.
Pattern board for installation is printed on the packing. Cut off the pattern for opening the false ceiling and installation of
suspension bolts.
2
Cut out the area for the indoor unit in the false ceiling and install suspension bolts, as shown in Fig. 3.3.
860 to 910
Dimension of opening
Unit size
Dimension of
suspension bolts
4-positions of
suspension bolts
(Unit: mm)
Unit size
860 to 910
Dimension of opening
Dimension of
suspension bolts
Piping
connection side
Drain piping
connection side
Optional panel
Fig. 3.3 Opening of False Ceiling and Suspension Bolts
3
Ensure that the ceiling is in horizontally level, otherwise drainage flow cannot be achieved.
4
Strengthen the opening parts of the false ceiling.
5
Mount suspension bolts, as shown in Fig. 3.4.
•
For Concrete Slab
•
For Steel Beam
Insert
(100 to 150kg)
150 to 160mm
Concrete
Anchor bolt
(W3/8 or M10)
Steel
"
I
" shaped
steel beam
Suspension bolt
(W3/8 or M10)
Fig. 3.4 Mounting Suspension Bolts
INSTALLATION AND MAINTENANCE
HO2019289HA
15
EN