5.7 Refrigerant Recovery Methods
When the unit must be moved and outdoor
’s refrigerant have to be recovered, please
follow these steps to implement the operation.
1) Please close the gas line stop valve, liquid line stop valve and the mani-fold
gauge.
2) Please turn on the power source.
3) Setting to ON of outdoor unit electrical board DSW1-1, please implement cooling
operation, then closed the liquid line stop valve, and refrigerant recovered
operation will be started.
4) When the low-pressure (gas line stop valve) side of the pressure display
-0.01MPa (-100mmHg), please action rapidly according the following
instructions
:
1.Please close the gas line stop valve.
2. Setting to OFF of outdoor unit electrical board DSW1-1. (Unit stop).
5) Please turn off the power source.
Caution
●Please do not let low-pressure gauge to measure the pressure is lower than-0.01MPa.
●When the refrigerant recovered operation, the low pressure is less than-0.01MPa, will result in compressor
failure.
6. Electrical Wiring
6.1 Wiring Capacity
1) The indoor and outdoor unit transmission
cable of the connection is a non-polar.
2) The type of earth leakage breaker required for the " high-speed type " (active time less than 0.1 sec.), when to buy, please pay
special attention.
3) Around the unit installed over current breaker, the manual switch and earth leakage breaker (ELB) should be separated, but need set
up it together.
4) Outdoor unit power supply specification for the 3
Φ
230V / 380V 60Hz
。
5) Wiring capacity, please according to the following table.
Power
Supply
3
Φ
60Hz
Maximum
Current
(A)
ELB(Earth Leakage Breaker)
Power Switch
Power
Supply
Size
(mm
2
)
Earth Wire
Size
(mm
2
)
Transmission
Cable
Size
Number of
Poles
Rating Sensitivity
Current
(mA)
Rating
Current
(A)
Switch
Capacity
(A)
Fuse
Capacity
(A)
1
2
2
3
4
5
RAM-200FPS
230V
22
3
30
30
60
30
3.5
5.5
2-Core Shielded
Twist Pair Cable
0.75mm
2
Total Length
1000m
Below
RAM-250FPS
29
40
40
5.5
RAM-270FPS
37
100
50
100
50
5.5
RAM-200FPSD
380V
14
4
30
20
30
20
2.0
3.5
RAM-250FPSD
18
30
60
30
3.5
RAM-270FPSD
23
30
3.5
Note: When earth leakage breaker specification selection, please according to above table (Note: The earth leakage breaker of power
supply 380V has to use 3
Φ
4 wire)
‧
Wiring Example
:
6.2 Wiring Essential
●
The power source cord and transmission cable ,please according to the following essentials
to implement.
1) To prevent electric shock accidents, in the electrical wiring, maintenance and
other operations before to open the services cover, please turn off power supply
completely before implementation.
2) Be sure the indoor unit power supply connect with each indoor unit which are all same outdoor unit. And all indoor unit, please install
Item
Model
DIP Switch
(DSW1-1 Setting
To ON)
Mani-Fold Gauge
Liquid
Stop
Valve
Gas Stop Valve
transmission cable (non-polar)
Indoor
Indoor
Outdoor
Gas Piping
Liquid Piping
Power Supply
Wire
Transmission
Wire
※
Piping thermal insulation material, Please use
can withstand high temperature gas piping of
the heat resistant specification products.
Indoor
Unit
Indoor
Unit
Indoor
Unit
Indoor
Unit
Outdoor
Unit
Remote
Controller
Remote
Controller
Remote
Controller
Remote
Controller
ELB
Power
Switch
CAUTION
:
All the field wiring and electrical components must comply with local codes.
Содержание RAM-200FPS
Страница 24: ...24 66MP1306 Printed in Philippines ...