
– 89 –
1. Disconnect power plug.
2. Wait for 10 minutes or more after power is turned off and then remove electrical parts box lid. As shown below.
Apply soldering iron of 30-75W for 15 seconds or more to P1 and N1 black/white lead receptacles on system
power module to discharge voltage from smoothing capacitor.
Do not loosen or remove screws of system power module: If screw is loose, voltage will not be discharged.
3. Before operation check of each part of circuit, remove receptacle of red/gray lead connected to system power
modelu from diodde stack.
Caution
●
Voltage of about 360V is charged at both ends of smoothing capacitor 330
μ
F x 3.
●
High voltage (DC 360V) is also charged at screw and terminal sections of system power module.
●
During continuity check of each circuit of electrical parts in outdoor unit is performed, to prevent
secondary trouble, disconnect red/gray wire connected to system power module (SPM) from diode stack.
(Also be sure to perform discharging of smoothing capacitor.)
Do not use soldering iron with
transformer: Doing so will blow thermal
fuse inside transformer.
As shown left, apply soldering iron to metal
parts (receptacles) in sleeve corresponding
to P and N1 terminals of system power
module.
Discharge procedure and how to cut off power to power circuit
DANGER
W
ARNING
Screws of system power module are live parts: Do not touch
them. Screw tightening torque and method are strictly specified.
When the screw is loosened or removed once, be sure to
tighten according to the procedure shown on the right, with
tightening torque of 0.8
±
0.2N•m.
No.1
No.7
No.6
No.3
No.4
No.5
No.2
SMOOTHING
CAPACITOR
SPM (SYSTEM
POWER MODULE)
DIODE STACK
SERVICE SWITCH
2P TERMINAL BOARD
REACTOR
CONTROL P.W.B
SELF-DIAGNOSIS LAMPS
SWITCHING
POWER P.W.B
OUTDOOR
UNIT 1
SMOOTHING
CAPACITOR
SPM (SYSTEM
POWER MODULE)
DIODE STACK
SERVICE SWITCH
2P TERMINAL BOARD
REACTOR
CONTROL P.W.B
SELF-DIAGNOSIS LAMPS
SWITCHING
POWER P.W.B
OUTDOOR
UNIT 2
LD301
LD302
LD303
LD304
LD301
LD302
LD303
LD304
ÇO?E?E?E?E?EÇ`
ÇO?E?E?E?E?EÇ`
ÇPÇR
ÇPÇS
ÇPÇS
ÇPÇR
A
B
S
S
Содержание RAM-130QH5
Страница 10: ... 11 SIX ROOM SYSTEM MULTI R A C RAM 130QH5 CONNECTING POSISION TO BE ABLE TO INSTALL ...
Страница 20: ... 22 CAPACITY DIAGRAM RELATED TO THE PIPING LENGTH MODEL RAM 130QH5 ...
Страница 25: ... 29 6V01 ...
Страница 26: ... 31 ...
Страница 28: ... 35 ...
Страница 33: ... 41 Outdoortemperature STAROTP_C TSKTM1_C1 Outdoortemperature STAROTP_C TSKTM1_C2 ...
Страница 34: ... 43 ...
Страница 35: ... 45 ...
Страница 36: ... 47 ...
Страница 37: ... 49 ...
Страница 47: ... 59 5A ...
Страница 54: ... 66 ...
Страница 55: ... 67 5 Reversing valve control circuit Fig 5 1 ...
Страница 58: ... 70 8 Overload control circuit OVL control circuit Fig 8 1 Overload Control System Configuration Fig 8 2 ...
Страница 77: ... 92 TROUBLESHOOTING OF THE SYSTEM POWER MODULE ...
Страница 78: ... 93 ...
Страница 79: ... 94 ...
Страница 83: ... 98 ...
Страница 84: ...HITACHI PM NO 0000 Printed in Malaysia RAM 130QH5 ...