background image

OUTDOOR UNIT

Removal Of Air From The Pipe And Gas Leakage Inspection

Gas Leakage Inspection

Please use gas leakage detector to check if leakage
occurs at the connection of Flare nut as shown on
the right.

If gas leakage occurs, further tighten the connection
to stop leakage. (Use the detector provided for
R410A)

FINAL ST

A

GE OF INST

ALLA

TION

Insulation And Maintenance Of Pipe Connection

1

The connected terminals should be completely sealed with
heat insulator and then tied up with rubber strap.

Please tie the pipe and power line together with vinyl tape as
shown in the figure showing the installation of Indoor and
Outdoor units. Then fix their position with holders.

To enchance the heat insulation and to prevent water
condensation, please cover the outdoor part of the drain hose
and pipe with insulation pipe.

Completely seal any gap with putty.

  Installation Of Remote Controller

2

  Power Source And Operation Test

3

The remote controller can be placed in its holder which is
fixed on wall or beam.

To operate the remote controller at its holder, please ensure
that the unit can receive signal transmitted from the controller
at the place where the holder is to be fixed. The unit will beep
when signal is received from the remote controller. The signal
transmission is weaken by the fluorescent light. Therefore,
during the installation of the remote control holder, please
switch on the light, even during day time, to determine the
mounting location of the holder.

Power Source

CAUTION

!

Please use a new socket. Accident may occur due to the use
of old socket because of poor contact.

Please plug in and then remove the plug for 2 – 3 times. This
is to ensure that the plug is completely plugged into the socket.

Keep additional length for the power cord and do not render
the plug under external force as this may cause poor contact.

Do not fix the power cord with U-shape nail.

Operation Test

Please ensure that the air conditioner is in normal operating
condition during the operation test.

Explain to your customer the proper operation procedures
as described in the user’s manual.

<

IA619: A 

>

3

Procedures of using Vacuum Pump for Air Removal

As shown in right figure, remove the cap
of valve core. Then, connect the charge
hose. Remove the cap of valve head.
Connect the vacuum pump adapter to
the vacuum pump and connect the
charge hose to the adapter.

Fully tighten the “Hi” shuttle of the
manifold valve and completely unscrew
the “Lo” shuttle. Run the vacuum pump
for about 10–15 minutes, then completely
tighten the “Lo” shuttle and switch off
the vacuum pump.

2

Completely unscrew the spindle of the
service valve (at 2 places) in anti-
clockwise direction to allow the flow of
refrigerant (using Hexagonal Wrench
key).

3

Remove the charge hose and tighten the
cap of valve head. Check the cap’s
periphery if there is any gas leakage.
The task is then completed.

4

1

   Preparation of Pipe

1

Use a pipe cutter to cut the copper pipe.

Jagged edge will cause leakage.

Point the side to be trimmed downwards during trimming to prevent copper
chips from entering the pipe.

Before flaring, please put on the flare nut.

   Pipe Connection

2

INST

ALLA

TION OF REFRIGERA

TING PIPES AND AIR REMO

VA

L

CAUTION

!

Outer
Diameter (mm)

6.35 (1/4)

9.52 (3/8)

12.70 (1/2)

15.88 (5/8)

1.0~1.5

1.0~1.5

1.0~1.5

1.0~1.5

Clutch type

A (mm)

AIR REMO

V

A

L

WARNING

Investigate the power supply capacity and other
electrical conditions at the installation location.
Depending on the model of room air conditioner
to be installed, request the customer to make
arrangements for the necessary electrical work
etc.
The electrical work includes the wiring work up
the outlet. In localities where electrical
conditions are poor, use of a voltage regulation
is recommended.

Install outlet for the room air conditioner within
the reaching range of the line cord.

IMPORTANT

THIS APPLIANCE MUST
BE EARTHED.

Procedures of Wiring

!

CONNECTION OF PO

WER CORD

WARNING

!

Please face this side
(suction side) of the unit to
the wall.

Please remove side cover
when connecting the
connecting cord.

Recommend to use
R410A flaring tool.

CAUTION

!

In case of removing flare nut of an Indoor unit, first remove a nut
of small diameter side, or a seal cap of big diameter side will fly
out. Prevent water from entering into the piping when working.

When the meter reaches - 101KPa
(-76cmHg) during pumping, fully
tighten the shuttle.

Meter showing pressure

Closed

R410A
Manifold valve

Vacuum
pump

Valve

Charge hose

Valve

Vacuum pump
adapter

When pumping starts, slightly loosen the
flare nut to check of air sucked in. Then
tighten the flare nut.

Copper pipe

Trimming tool

A

Die

Die

Copper pipe

1.5~2.0

1.5~2.0

1.5~2.5

1.5~2.5

Wrench

Torque
wrench

Flare nut

Lo

Hi

The body of
service valve

Cap of
valve core

Hexagonal
Wrench Key

Cap of valve head

Cap of valve head

Sleeve of
protection pipe

Putty

Putty

Insulation material for pipe connection

Outer

dia.of pipe

6.35 (1/4")

9.52 (3/8")

12.7 (1/2")

6.35 (1/4")

9.52 (3/8")

12.7 (1/2")

Valve

head cap

Torque N·m

(kgf  · cm)

13.7  – 18.6 (140 – 190)

34.3  – 44.1 (350 – 450)

44.1  – 53.9 (450 – 550)

19.6  – 24.5 (200 ~ 250)

19.6  – 24.5 (200 ~ 250)

29.4  – 34.3 (300 – 350)

12.3  – 15.7 (125 ~ 160)

Small dia. side

Large dia. side

Valve core cap

Small dia. side

Large dia. side

Power supply shall be connected at the rated voltage, otherwise
the unit will be broken or could not reach the specified capacity.

D

C

N

L

D

C

Indoor Unit

Outdoor Unit

Connecting Cord

Connecting Cord

AC 220 - 240V

1.6 or

2.0

2.0

25mm

25mm

Strip wires

GRN +
YEL

Power line

Control line

10mm

10mm

10mm

35mm

Outdoor Unit

30mm

10mm

10mm

70mm

GRN + YEL

Strip wires

Indoor Unit

Detail of cutting the connecting cord

When removing the connecting wires for the Indoor unit,
please remove the low cover panel in front of the unit.

If you cannot attach the side
plate due to the connecting
cord, please press the
connecting cord in direction
to the front panel to fix it.

Be sure that the hooks of the
side plate is fixed in certainly.
Otherwise water leakage may
occur and this causes short
circuit or faults.

Wiring of The Outdoor Unit

Please remove the side plate for wire connection.

Fuse Capacity

16A time delay fuse

Please mount the outdoor unit on stable ground to prevent vibration

and increase of noise level.

Decide the location for piping after sorting out the different types of

pipe available.

Open the side plate by unscrewing the screws as shown below.

Remote
Controller

Holder for
Remote Controller

Screw (2 pieces)

The controller should be
insert from top into
bottom side of the holder
as shown in figure below.

The naked part of the wire core should be 10 mm and
fix it to the terminal tightly. Then try to pull the individual
wire to check if the contact is tight. Improper insertion
may burn the terminal.

Be sure to use only power cables approved from the
authorities in your country. For example in Germany:
Cable type: NYM 3x1.5mm

2

 (Fuse = 16A time delay).

Please refer to the installation manual for wire connection
to the terminals of the units. The cabling must meet the
standards of electrical installation.

There is a AC voltage of 220-240V between the L and
N terminals. Therefore, before servicing, be sure to
remove the plug from the AC outlet or switch off the
main switch.

Do not make any connection in the middle of the
connecting cable. It may cause the wire over heated,
emit smoke and fire.

WARNING

!

Earth terminal

C D

L N

Wing nut type

Thickness

(mm)

0.8

0.8

0.8

1.0

0.0 

~

 0.5

0.0 

~

 0.5

0.0 

~

 0.5

0.0 

~

 0.5

Flare tool for R410A

Clutch type

Conventional flare tool

Pump Down Method When Reuse
Existing Piping (R22 Model) for
R410A Model

Compressor oil of R22 model is insoluble in compressor
oil of R410A model. The mixing of compressor oil may
cause damage of compressor.

Possibility of Mixing

Reuse of piping of R22 model is dangerous because of its
compressor oil.

When reuse piping of R22 model, pump down must be
carried out properly to ensure compressor oil which is
remained inside piping is collected away.

To Reuse Old Piping

Piping of R22 model can be reused only when air-
conditioner is properly pumped down.

The purpose of pump down is to collect back the
compressor oil (which is mixed with refrigerant and
circulating inside refrigeration cycle) properly into the
outdoor unit of air conditioner.

Most Important Process

Purpose: To make the oil &
refrigerant mix together.
They are in separated
condition when
air conditioner is
stopped.

Mixed
refrigerant & oil
will be collected
into outdoor
unit.

3

Take out air conditioner

4 Install New Refrigerant air

unit.

conditioner

It is advisable to flush the
piping with R410A to avoid
any contamination remain
before new installation.

Reuse of piping R-22 model only apply if previous model
is Hitachi and proper pump down method is used.

CAUTION

!

Proper Pump Down Method

1

Operate air conditioner

2

After 10~15 minutes of pre

at cooling mode for

operation, close 2s valve.

10~15 minutes.

After 3 minutes, close 4s valve.

Connect the
earth cord

D

C

Pull the cover at 

1

 and 

2

 in

the directions as shown by
arrows to remove the low
cover.

Wiring Of The Indoor Unit

For wire connection of the Indoor unit, you need to remove Low Cover and Indicator Cover.

After remove the screw and cover,
and put the connecting cords and fix
the cover with screw.

TEMPORARY
SWITCH

1

Indicator 
Cover

Screw

Low cover

Remove Screw and Indicator Cover

TE

MPOR

AR

Y

SWITCH

2

TEMPORAR

Y

SW

ITCH

5

Attach Indicator Cover and tightened screw 
(do not tightened too hard as the screw hole
at front cover might be broken)

Attach back Low Cover

TEMPORARY
SWITCH

7

3

4

Please fix back the electrical
plate after wiring work is
complete. Otherwise if short
circuit occur it may cause
unit burn.

WARNING

!

(EN2) INS RAS-X10CZ

18/12/09, 9:30

1

Содержание RAC-X10CZ

Страница 1: ...wise condensed water may overflow the water container Direct Mounting On The Wall Please use hidden beams in the wall to hold the hanger Wall Penetration and Installation of Protection Pipe Drill a ø 65mm hole on wall which is slightly tilted towards the outdoor side Drill the wall at a small angle Cut the protection pipe according to the wall thickness Empty gap in the sleeve of protection pipe s...

Страница 2: ...e core Hexagonal Wrench Key Cap of valve head Cap of valve head Sleeve of protection pipe Putty Putty Insulation material for pipe connection Outer dia of pipe 6 35 1 4 9 52 3 8 12 7 1 2 6 35 1 4 9 52 3 8 12 7 1 2 Valve head cap Torque N m kgf cm 13 7 18 6 140 190 34 3 44 1 350 450 44 1 53 9 450 550 19 6 24 5 200 250 19 6 24 5 200 250 29 4 34 3 300 350 12 3 15 7 125 160 Small dia side Large dia si...

Страница 3: ...r atau senget sedikit ke sebelah salur air Kalau tidak air terkondesasi mungkin akan mengalir keluar Kawasan dinding yang sesuai untuk pemasangan Sila pasangkan plat pemasangan pada tiang dalam dinding Menebuk lubang pada dinding dan pemasangan salur pelindung Semasa menebuk lubang ø 65 mm condongkan ke bawah sedikit di sebelah dinding luar kekalkan kecondongan ini Keratkan salur pelindung mengiku...

Страница 4: ...n plag yang baru Penggunaan plag yang lama mungkin akan menyebabkan kemalangan atau kerosakan kerana terdapat kelonggaran Sila tarik dan masukkan plag ke dalam soket 2 3 kali supaya plag boleh masuk ke dalam soket sepenuhnya Tolong lebihkan sedikit kepanjangan kabel untuk mengelakkan tindakan daya luar ke atas plag serta sentuhan di antara plag dengan soket adalah sempurna Jangan pakukan kabel ele...

Отзывы: