background image

Drain hose

Installation of Mounting Plate, Wall Penetration And Protection Pipe

1

CAUTION

!

The draining of the water container inside the indoor unit can be done from the left. Therefore the mountting plate must be
fixed horizontally or slightly tilted towards the side of drain hose. Otherwise, condensed water may overflow the water
container.

Direct Mounting On The Wall

Please use hidden beams in the wall to hold the mounting plate.

Wall Penetration and Installation of Protection Pipe

Drill a ø 65mm hole on wall which is slightly tilted towards
the outdoor side. Drill the wall at a small angle.

Cut the protection pipe according to the wall thickness.

Empty gap in the sleeve of protection pipe should be
completely sealed with putty to avoid dripping of rain water
into the room.

Procedures of Installation and Precautions

Procedures to fix the mounting plate.

1. Drill holes on wall.

2. Fix the mounting plate on wall

(As shown below)

with 4.1 x 32 screw
(As shown in figure below)

Procedures to fix the holder of remote control.

1. Drill holes on wall.

(As shown below)

   Installation of the Indoor Unit

2

VERTICALLY DOWNWARD PIPING

  Preparation

Connect connecting cord.

Pull out the pipe, power cord and drain hose.

  Installation

The upper part of the indoor unit is hanged on the mounting plate.

The projection at the lower part of the indoor unit is hooked onto the mounting plate.

Please pull the lower part
of the indoor unit
outwards to check if the
unit is hooked onto the
mounting plate. Improper
installation may cause
vibration and noise.

!

CAUTION

HORIZONTAL PIPING

  Preparation

Change of Drain Hose and Installation Procedures.

Exchange the location of drain hose and drain cap during horizontal piping as shown
in figure below. Be sure to plug in the drain hose until the insulating material folds upon
itself.

Please use pliers to pull out the drain cap.
(This is an easier way to remove the drain cap).

Drain cap

Drain cap

Please insert
until here

Drain hose

Please insert
until here

!

CAUTION

Condensed water may leak
out if not inserted properly.

HORIZONTAL & DOWNWARD PIPING – MAKING OPENINGS

During horizontal or downward piping, use a knife to cut openings as shown in figure.
Then smoothen the edges of openings with a file.

Be sure that the wire is not
in contact with any metal
in the wall. Please use the
protection pipe as wire
passing through the hollow
part of the wall so as to
prevent the possibility of
damaged by mouse.

!

CAUTION

2~5mm

Protection

pipe

Outdoor

Indoor

Seal with

putty

Sleeve of

protection pipe

WALL

INDOOR UNIT

Transform the piping while holding down the lower
portion of pipe-support by hand.

Drain Hose

Drain Cap

Wrap With The
Tape

Hanger

Refrigerating Pipe

Projection Pipe

Drain Hose

Two Way Air
Exchange Hose

Connecting Cord

Hanger

Projection

Drain Hose

Visible Outline Of The Indoor Unit

  

The end of big
refrigerant pipes.

Center line for
mounting plate
level adjustment.

The end of small
refrigerant pipes.

500 mm

500 mm

500 mm

500 mm

500 mm

Stamp

Level

Screw For
Hanger

Wall Hole

Weight

Line

Pipe support

Pull Up The pipe After
Bending Downward

Openings

Openings

INSTALLATION OF COOLANT PIPES AFTER CONNECTION

The coolant pipes should be adjusted to fit into the hole on the wall and then ready for further connection.

The terminals of 2 connected pipes must be covered with insulator used for terminal connection.

Connect the power cord.

After adjustment, fit the power cord and pipes into the space available under the indoor unit.

!

CAUTION

The rubber strap used for
fixing the insulator should not
be tied with great force.
Otherwise, this will damage
heat insulation and causes
water condensation.

Pipe

Rubber strap tied with great force

Drain layout of backward piping
from left ¿65 area

Cross section view for pipes
arrangement at backward ø65
wall diameter.

Wall Hole

Bend Coolant Pipe Until
Touching Air Exchanger
Hose As Shown in Figure

Air Exchanger Hose

Coolant Pipe

Insulation Pipe (must be wrapped
with vinyl tape at every 120mm).

THE CONNECTION OF COOLANT PIPE DURING THE INSTALLATION OF INDOOR UNIT

Preparation To Install Coolant Pipes

!

CAUTION

Please fix in the plastic core
after flaring to avoid plastic
chips entering the pipes.

Coolant pipes and power cord must be tied together.

  Installation

Hang the indoor unit onto the mounting plate. Use the temporary stand at the back of the indoor unit to push its lower
part 15cm forwards.

Place the drain hose through the hole on the wall.

Insulate the connecting portion of coolant pipe with insulator.

Connect the power cord.

After adjustment, the power cord and coolant pipes are placed into the space available under the indoor unit.

The projection of indoor unit must hook to the mounting plate.

Below 5mm

Please Bend At A Small
Radius To Form An Arc

Projection

Hook

Temporary
Support

About 15cm

Sub Insulation Sheet

Refrigerating Pipe

Heat Insulation Pipe

Connecting Cord

Insulation Material
For Pipe Connection

Connected Section

Connecting
Cord

Holder

Air Exchange Hose

Protection Pipe

Drain Hose

Содержание RAC-R10EX

Страница 1: ...power wireless systems The installation height of indoor unit must be 2 3m or more CAUTION Do not expose the unit under direct sunshine or rain Besides ventilation must be good and clear of obstruction The air blown out of the unit should not point directly to animals or plants The clearances of the unit from top left right and front are specified in figure below At least 2 of the above sides must...

Страница 2: ...he possibility of damaged by mouse CAUTION 2 5mm Protection pipe Outdoor Indoor Seal with putty Sleeve of protection pipe WALL INDOOR UNIT Transform the piping while holding down the lower portion of pipe support by hand Drain Hose Drain Cap Wrap With The Tape Hanger Refrigerating Pipe Projection Pipe Drain Hose Two Way Air Exchange Hose Connecting Cord Hanger Projection Drain Hose Visible Outline...

Страница 3: ...e connection to stop leakage Procedures of using Vacuum Pump for Air Removal As shown in figure on the right remove the cap of valve head and valve core and then connect them to the vacuum pump and sub division valve Fully tighten the Hi shuttle of the sub division valve and completely unscrew the Lo shuttle Run the vacuum pump for about 10 15 minutes then completely tighten the Lo shuttle and swi...

Страница 4: ...ap Please tie the pipe and power line together with plastic tape as shown in the figure of installation of both the indoor and outdoor units Then fix their position with holders To enchance the heat insulation and to prevent water condensation please cover the outdoor part of the drain hose and pipe with insulation pipe Completely seal any gap with putty Insulation Material For Pipe Connection Sle...

Отзывы: