Glossary
This section explains the terminology you need to know when using the CB 2500.
A
active blade
When using the N+M cold standby function, the active blade is the server blade that is
actively running your applications.
APC (Accurate Power Control)
A function that uses power capping to limit the power consumption of the system unit.
The APC function reduces power consumption by controlling the CPU clock rate of the
system unit when power consumption exceeds a predetermined level.
B
BMC
Baseboard Management Controller
A controller that monitors and controls the status of server blades. The BMC monitors
and controls server blades by connecting to the system console and the management
module.
C
CLI
Command Line Interface
CNA
Converged Network Adapter
#
O
X
Y
Z
Glossary-1
Hitachi Compute Blade 2500 Series Getting Started Guide
Содержание Compute Blade 2500
Страница 20: ...xx Preface Hitachi Compute Blade 2500 Series Getting Started Guide ...
Страница 82: ...4 6 Stopping the CB 2500 Hitachi Compute Blade 2500 Series Getting Started Guide ...
Страница 98: ...5 16 Functionality and Operation of the Remote Console Hitachi Compute Blade 2500 Series Getting Started Guide ...
Страница 106: ...6 8 Troubleshooting Hitachi Compute Blade 2500 Series Getting Started Guide ...
Страница 124: ...A 18 System Unit Specifications Hitachi Compute Blade 2500 Series Getting Started Guide ...
Страница 132: ...B 8 Taking a Memory Dump of the OS Running on a Server Blade Hitachi Compute Blade 2500 Series Getting Started Guide ...
Страница 152: ...Index 6 Hitachi Compute Blade 2500 Series Getting Started Guide ...
Страница 153: ...Hitachi Compute Blade 2500 Series Getting Started Guide ...