
25
CP-A100 / ED-A100 / ED-A110 (A1DN)
Each color part has
the
same construction. By using swab and air duster, you can
easily remove dust from panel and optical filter.
3. Maintenance point
4. Cleaning the panels and optical filters
(1) Turn on the set and li
gh
t
up
the lamp.
(2) By using swab and air duster, remove the dust. Focusing dust
,
make s
ure
you check the dust on screen.
• While removing the dust, separated dust will be blown
off by air cooling system.
• Please pay attention not to damage panels and optical
filters.
• Bend the top of SWAB a little if it is hard to insert the
SWAB.
Panel
Holder
Optical filter
5. Re-assembly
(1) Turn off the set and unplug the power cord.
(2) Remove an insulator from S801.
(3) Screw down the PWB assembly MAIN and connect the LCD panel flexible cables to the PWB assembly MAIN.
(4) Re-assemble the set.
(5) While re-assembling, please clean the intake filter by using a vacuum cleaner.
Actual formation
OPTICAL
FILTER
OPTICAL
FILTER
HOLDER
PANEL
Содержание A1DN
Страница 14: ...14 CP A100 ED A100 ED A110 A1DN 5 Troubleshooting Check points ...
Страница 71: ...THIS PAGE INTENTIONALLY LEFT BLANK 71 ...
Страница 72: ...72 MEMO ...
Страница 92: ...92 CP A100 ED A100 ED A110 A1DN MEMO ...
Страница 93: ...CP A100 ED A100 ED A110 A1DN 1 2 3 4 5 6 1 2 3 4 5 6 A B C D E F G POWER UNIT BALLAST 1 ...
Страница 94: ...CP A100 ED A100 ED A110 A1DN 1 2 3 4 5 6 1 2 3 4 5 6 A B C D E F G POWER UNIT BALLAST 2 ...
Страница 95: ...CP A100 ED A100 ED A110 A1DN 1 2 3 4 5 6 1 2 3 4 5 6 A B C D E F G POWER UNIT CIRCUIT 1 ...
Страница 96: ...CP A100 ED A100 ED A110 A1DN 1 2 3 4 5 6 1 2 3 4 5 6 A B C D E F G POWER UNIT CIRCUIT 2 ...