To help prevent serious injuries, load the components in the storage cabinet in the
prescribed order:
1.
If present, install the rack stabilizer plate to the front of the system cabinet.
2.
Load the Fibre Channel (FC) switches in the storage cabinet at the positions
recommended in the
System Installation Guide
. The positions can be adjusted
according to a
specific
storage cabinet
configuration.
3.
Load and position the server(s) directly above the FC switches, if used in your
configuration.
4.
The System Management Unit (SMU), if used in your
configuration,
should be
placed directly below the FC switches.
5.
The
first
storage enclosure should be positioned at the bottom of the storage
cabinet. Additional enclosures are then placed above existing enclosures, going
towards the top of the system cabinet.
6.
Once the bottom half of the storage cabinet has been
filled,
the top half of the
storage cabinet can be
filled.
Begin by placing a storage component directly above
the server and then
fill
upwards.
Safety and handling precautions
Chapter 2: Safety information
Hitachi NAS Platform and Hitachi
Unified
Storage Series 4000 Hardware Reference
18