Console Replacement Instructions
© 2006
Hirschmann ECS
031-300-530-032 Revision F 03/28/06 0032_F53
Page 5
PROCEDURE 2. STRAIN RELIEF INSTALLATION
1. Remove existing cable, ferrite filter and strain relief from central unit. (Fig. 5)
2. Install the new PG13.5 RED/WHT strain relief using the existing PG13.5 nut, from the strain
relief just removed.
3. Reinstall ferrite filter. (Fig. 5a).
Note: Outer shield is grounded at strain relief insert.
Fig. 5
Fig. 5a
Содержание PAT 050-350-061-351
Страница 19: ......