22
Installation OCTOPUS OS20/OS24 Unmanaged
Release 08 07/2015
2
Installation
The devices have been developed for practical application in a harsh
industrial environment.
On delivery, the device is ready for operation.
Perform the following steps to install and configure the device:
Connecting the connector for the supply voltage
Installing and grounding the device
2.1
Checking the package contents
Check whether the package includes all items named in the section
“Scope of delivery” on page 35
Check the individual parts for transport damage.
2.2
Connecting the connector for the
supply voltage
Note:
Only connect the device to a power supply that complies to surge
voltage category II or lower.
2.2.1
Devices featuring supply voltage with the
characteristic value A
WARNING
ELECTRIC SHOCK
The nominal voltage of 48 V specified for trains can temporarily exceed the
SELV threshold of 60 V based on EN 50155 para. 5.1.1.1. Use additional
measures to limit the surge voltage to 60 V or use a lower nominal voltage.
Failure to follow these instructions can result in death, serious injury,
or equipment damage.
Содержание OS20-001000T5T5TAFUHB
Страница 39: ...Installation OCTOPUS OS20 OS24 Unmanaged Release 08 07 2015 39 ...
Страница 40: ......