HIRED-HAND Super-Saver Bunsen Jet Скачать руководство пользователя страница 8

Bunsen Jet HSI Radiant Brooder

6

9. Maintenance

1.

 

Your Super Saver Bunsen Jet Radiant Brooder should be inspected before each use and at
least annually by a qualified service person.

2.

 

The appliance area should be kept clear and free from combustible materials, gasoline, and
other flammable vapors and liquids.

3.

 

The gas hose should be inspected prior to each use of the brooder.  If it is evident there is
excessive abrasion or wear, or the hose is cut, it must be replaced prior to the brooder being
put into operation.

4.

 

The flow of combustion and ventilation air must not be obstructed.

5.

 

Inspect brooder and gas connections periodically for gas leaks with an approved gas leak
testing solution.  (Soap and water work well.)

6.

 

The burner, flame sense probe, orifice, and igniter assemblies should be kept clean and free of
carbon build-up.

7.

 

The brooder must be cool before wash-down.  Do not operate brooder for one hour following
wash-down.

8.

 

Thermostat coils must be kept clean to assure proper temperature control.

Содержание Super-Saver Bunsen Jet

Страница 1: ...her flammable vapors and liquids in the vacinity of this or any other appliance 1 Ouvrez les fenetres 2 Ne touchez pas aux interrupteurs electriques 3 Eteignez toute flamme nue 4 Contactez immediateme...

Страница 2: ...ng of product 3 5 Use of equipment 3 6 Assembly 3 6 1 Tools Required 3 6 2 Igniter Assembly 3 6 3 Burner Assembly 3 6 4 Support Ring Assembly 4 6 5 Burner Unit Assembly 4 6 6 Final Brooder Assembly 4...

Страница 3: ...hnician with maximum load on supply and while brooder is in operation A maximum of 14 in W C 34 8 mbar and a minimum of 5 in W C 12 5 mbar gas pressure is to be supplied to the inlet of the gas valve...

Страница 4: ...must be installed outside building 16 Brooder must not be operated for one hour following wash down 3 Limited Warranty All products are warranted to be free from defects in material and workmanship if...

Страница 5: ...e outside of the controls enclosure near the gas and power inlets 5 Use of equipment This radiant brooder is designed to heat agricultural enclosures Do not use this equipment to heat human living qua...

Страница 6: ...ttach control enclosure brackets 18 to control enclosure 16 with four 8 32 X 1 2 screws 12 and 8 32 nuts 13 provided 3 Attach assembled control enclosure to canopy 15 with four 8 32 X 1 2 screws 12 an...

Страница 7: ...ilt in pressure regulator on the gas control valve to the acceptable manifold pressure that is found on the ratings plate and page two of the owners manual 8 To adjust the manifold gas pressure remove...

Страница 8: ...excessive abrasion or wear or the hose is cut it must be replaced prior to the brooder being put into operation 4 The flow of combustion and ventilation air must not be obstructed 5 Inspect brooder a...

Страница 9: ...H ITEW IREFROMCORDSETW ITHAW IRENUTORBELLCAP 3 4 5 6 7 C O N N E C TO R A N G EW IRETOIGNITERONBURNERPLATE C O N N E C TB R O W NW IRETOIGNITERONBURNERPLATE C O N N E C TO R A N G EW IRETOFLAMEPROBE...

Страница 10: ...Bunsen Jet HSI Radiant Brooder 8 11 Exploded view parts list 1 2 3 4 5 6 7 4 4...

Страница 11: ...Bunsen Jet HSI Radiant Brooder 9 8 9 1 0 1 1 1 2 1 3 1 4...

Страница 12: ...Bunsen Jet HSI Radiant Brooder 10 12 13 15 17 18 12 21 22 24 23 20...

Отзывы: