EMISSION CONTROL (J05E)
8–9
4.
MOUNTING THE EGR PIPE
(1)
Replace with a new gasket and mount the EGR pipe with 4 bolts
and 2 nuts.
Tightening Torque:
55 N·m {561 kgf·cm, 41 lbf·ft}
(2)
Mount the 2 brackets to the EGR pipe with 3 bolts and a nut.
Tightening Torque:
28.5 N·m {291 kgf·cm, 21 lbf·ft}
(3)
Mount the engine harness to 2 brackets.
5.
ADDING THE COOLANT
Reference: COOLING (J05E), RADIATOR, REPLACEMENT,
MOUNTING THE RADIATOR (Page 12-9)
EGR PIPE
SHTS021270700013
BRACKET
BRACKET
ENGINE HARNESS
SHTS021270700014
Содержание S5-LJ05E04A
Страница 4: ...INDEX ENGINE GROUP 2 2 ENGINE PTO POWER TAKE OFF INDEX_EN fm 3 ページ 2012年11月19日 月曜日 午前9時46分 ...
Страница 235: ...EMISSION CONTROL J05E 8 11 1 Closed ventilator 3 Element 2 Cap 4 Body 1 2 3 4 SHTS021270700016 ...
Страница 377: ...ENGINE MECHANICAL J05E 10 101 CRANKSHAFT COMPONENT LOCATOR EN01F02127090402028001 1 Crankshaft 1 SHTS021270900240 ...
Страница 378: ...ENGINE MECHANICAL J05E 10 102 1 Thrust bearing 2 Crankshaft bearing 1 2 SHTS021270900241 ...
Страница 550: ...COOLING J05E 12 15 RADIATOR CAP COMPONENT LOCATOR EN01F02127110402020001 1 Radiator cap 1 SHTS021271100023 ...