![HIMA HIMatrix DI 24 01 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/hima/himatrix-di-24-01/himatrix-di-24-01_manual_2136614016.webp)
4 Start-Up
DI 24 01
Page 16 of 34
HI 800 201 E Rev. 1.00
4 Start-Up
To start up the controller, it must be mounted, connected and configured in the
programming tool.
4.1
Installation and Mounting
The module is mounted in the subrack of the modular HIMatrix F60 system.
4.1.1
Mounting and Removing the Modules
To mount and remove the modules, the connection cable clamp terminals must be
unplugged.
Additionally, personnel must be protected from electrostatic discharge. For details, refer to
Chapter 2.1.2.
Mounting the Modules
To mount a module into the rack
1. Insert the module as far as it can go – without jamming it – into the two guiding rails
which are located on the upper and lower part of the enclosure.
2. Apply pressure to the upper and lower extremity of the front plate until the module plugs
snap into the backplane socket.
3. Secure the module with the screws located on upper and lower extremity of the front
plate.
The module is mounted.
Removing the Modules
To remove a module from the rack
1. Remove the plugs from the module front plate.
2. Release the locking screws located on the upper and lower extremity of the front plate.
3 Loosen the module using the handle located on the lower part of the front plate and
remove it from the guiding rails.
The module is removed.
Содержание HIMatrix DI 24 01
Страница 33: ......